Tender Details

Particulars Details
Title
Improvement To The Existing Earthen Bund To Protect Aapkare Sonaulim Khazan In V.P. Shiroda Of Shiroda Constituency Of Ponda Taluka
Description
Improvement To The Existing Earthen Bund To Protect Aapkare Sonaulim Khazan In V.P. Shiroda Of Shiroda Constituency Of Ponda Taluka
Organisation Government of Goa
Tender Id 2023_WRD_11174_1
Reference
Number
WDXI/PB/F.24/2023-24/678/Sr2
Tender Fee 15000
EMD 5.62 Lakh
Tender Value
Place Porvorim, Goa
Link https://eprocure.goa.gov.in
Start Date September 06, 2023 23:30
End Date

25/09/2023 ( Expired 639 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
One time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland

One time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland

Read more
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Improvement of rikhadi vacham motor road under one time maintenance in kapkot constituency of district bageshwar.

Improvement of rikhadi vacham motor road under one time maintenance in kapkot constituency of district bageshwar.

Read more
Construction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)

Construction of 4 new foot over bridges in&amp#x0d indore on design, built, operate and transfer&amp#x0d basis and maintenance of existing three fobs&amp#x0d for license period of 10 years (extendable to&amp#x0d five years)

Read more
One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan

One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan

Read more
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise