Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hiring Services Of 2 Nos. Of Multiphase Pumps For 180 Days
|
| Description |
Hiring Services Of 02 Nos. Of Multiphase Pumps For 180 Days
|
| Organisation | Oil and Natural Gas Corporation Limited | Public Sector Undertakings |
| Tender Id | 2025_ONGC_245378_1 |
|
Reference Number |
E16HC25008 |
| Tender Fee | 0 |
| EMD | 1.83 Lakh |
| Tender Value | - |
| Place | ONGC MEHSANA ASSET |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=280529 |
| Start Date | August 14, 2025 23:30 |
| End Date |
Expired
25/09/2025
Expired 388 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conducting multiphase engineering investigation of internal condition assessment of masonry section of hidkal dam
Conducting multiphase engineering investigation of internal condition assessment of masonry section of hidkal dam
Read moreConducting multiphase engineering investigation of internal condition assessment of right bank earthen part of hidkal dam
Conducting multiphase engineering investigation of internal condition assessment of right bank earthen part of hidkal dam
Read moreConducting multiphase engineering investigation of internal condition assessment of left bank earthen part of hidkal dam.
Conducting multiphase engineering investigation of internal condition assessment of left bank earthen part of hidkal dam.
Read moreLifting and transportation of legacy mixed waste from gvp/ctu under the jurisdiction of north zone by mechanical means for 180 days on tonnage basis.
Lifting and transportation of legacy mixed waste from gvp/ctu under the jurisdiction of north zone by mechanical means for 180 days on tonnage basis.
Read moreConstruction of bagwada bypass road bagwada river bridge to bagwada main road length 0.200 km pac 84.69 lakh sor 11.04.2025 time 180 days first call
Construction of bagwada bypass road bagwada river bridge to bagwada main road length 0.200 km
Read moreConstruction of 180 no. rec...
Estimate for construction of 180 no. recharge borewell kurukshetra
Read moreSubmersible turbine pumps 1.5 hp,submersible turbine pumps 0.75 hp
Submersible turbine pumps 1.5 hp,submersible turbine pumps 0.75 hp
Read moreof your Industry type