Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Table Top Plasma Sterilizer
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6436095 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 14, 2025 22:13 |
| End Date |
Expired
04/08/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of plasma cutting machines for unit-xi boiler
Supply of plasma cutting machines for unit-xi boiler
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreConstruction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc
Construction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc
Read moreSupply, installation and handover of archery, athletics, badminton, basketball, cycling, football, gatka, gymnastics, hockey, kalarippayattu, mallakhamb, softball, swimming, table tennis, tennis, thang ta, volleyball, weightlifting and yogasana equipment
Supply, installation and handover of archery, athletics, badminton, basketball, cycling, football, gatka, gymnastics, hockey, kalarippayattu, mallakhamb, softball, swimming, table tennis, tennis, thang ta, volleyball, weightlifting and yogasana equipment
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreSupply, fitting and fixing offurniture, false ceiling, wall paneling, interactive flat panel, wired conference system, conference table etc. for meeting hall at jai prakash university, chapra, saranfor the year 2026-27
Supply, fitting and fixing offurniture, false ceiling, wall paneling, interactive flat panel, wired conference system, conference table etc. for meeting hall at jai prakash university, chapra, saranfor the year 2026-27
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read morePandal work , toran gate , lcd screen, cctv camera, (fully lighting arrangement , loudspeaker or sound amplifier , chair, table, drink water etc for 4 days ) on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Pandal work , toran gate , lcd screen, cctv camera, (fully lighting arrangement , loudspeaker or sound amplifier , chair, table, drink water etc for 4 days ) on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreof your Industry type