Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm I Replacement Of Failed Stem In The Released Hp Ip Control Valves And Es Vs With New Stems
|
| Description |
Mtps I Tm I Replacement Of Failed Stem In The Released Hp Ip Control Valves And Es Vs With New Stems
|
| Organisation | TNEB Limited | TANGEDCO | CE-MTPS-I - TANGEDCO | SE-Mechanical Maintenance I-MTPS-I - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 6900 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 07, 2026 14:30 |
| End Date |
Open
21/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Read moreTtps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreof your Industry type