Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Well Foundation, Substructure & Superstructure Of Br No 54 (2x12.2m Psc) In Between Raniganj Triveniganj Section Of Supaul Araria Section In Samastipur Division Of East Central Railway.
|
| Description |
Construction Of Well Foundation, Substructure & Superstructure Of Br No 54 (2x12.2m Psc) In Between Raniganj Triveniganj Section Of Supaul Araria Section In Samastipur Division Of East Central Railway.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 07, 2026 00:32 |
| End Date |
Open
28/10/2026
13 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreStrengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Read moreSsi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Read moreSsi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Read more(i) ranchi-tori section: strengthening of foundation and substructure of br no 127 (5x12.2 m psc), repairing of wing wall, bridge protection works & construction of curtain wall and drop wall with other allied works between lohardaga (lad) and barkichampi (bici). (ii) preparation of completion drawing of ongoing and completed bridge works (18 bridges) under the jurisdiction of sr.den(south)/rnc. (2nd call)
(i) ranchi-tori section: strengthening of foundation and substructure of br no 127 (5x12.2 m psc), repairing of wing wall, bridge protection works & construction of curtain wall and drop wall with other allied works between lohardaga (lad) and barkichampi (bici). (ii) preparation of completion drawing of ongoing and completed bridge works (18 bridges) under the jurisdiction of sr.den(south)/rnc. (2nd call)
Read moreSupply, erection, testing & commissioning of 25kv ohe in section jadia-araria in connection with araria-supaul new line under samastipur division under jurisdiction of dy.cee/con/n/spj
For complete deion and other details, please refer to tender
Read moreSupplying and stacking machine crushed stone track ballast (pakur/shahebganj range) on cess as per railway s specification and standard & spreading the same on formation between triveniganj (excl.) to araria court (excl. nfr portion) of araria-supaul new bg rail line project in samastipur division of east central railway.
For complete deion and other details, please refer to tender
Read moreConstruction of only foundation and sub-structure for major bridge no. -72(1x30.5 m owg), 88(1x18.3 m cg) , 93(1x12.2 m psc slab), 102(1x12.2 m psc slab), 106 (10x12.2 m psc), 111(1x12.2 m psc slab) , 116 (1x12.2 m psc slab), a-1(1x12.2 m. psc slab), a-2 (1x12.2 m. psc slab), a-3(1x12.2 m. psc slab), a-4(1x12.2 m. psc slab), a-5(1x12.2 m. psc slab), and a-6(1x12.2 m. psc slab) and construction of foundation & substructure including fabrication of superstructure and its launching for br
For complete deion and other details, please refer to tender
Read moreConstruction of only foundation and sub-structure for major bridge no. -72(1x30.5 m owg), 88(1x18.3 m cg) , 93(1x12.2 m psc slab), 102(1x12.2 m psc slab), 106 (10x12.2 m psc), 111(1x12.2 m psc slab) , 116 (1x12.2 m psc slab), a-1(1x12.2 m. psc slab), a-2 (1x12.2 m. psc slab), a-3(1x12.2 m. psc slab), a-4(1x12.2 m. psc slab), a-5(1x12.2 m. psc slab), and a-6(1x12.2 m. psc slab) and construction of foundation & substructure including fabrication of superstructure and its launching for br
For complete deion and other details, please refer to tender
Read moreof your Industry type