Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Contract For Complete Reparing And Rebuilding Of Damaged Vibro Feeder Tray Of 210 Mw Chp I At Sgtps Mppgcl Birsinghpur
|
Description |
Work Contract For Complete Reparing And Rebuilding Of Damaged Vibro Feeder Tray Of 210 Mw Chp I At Sgtps Mppgcl Birsinghpur
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_398865_1 |
Reference Number |
4891 |
Tender Fee | 1295 |
EMD | 26500 |
Tender Value | |
Place | SGTPS MPPGCL Umaria |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=486510 |
Start Date | March 27, 2025 22:30 |
End Date |
29/04/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rate contract for complete repairing/rewinding of bhel make 100 kva transformer rectifier of esp system at 2x600 mw, sstpp,mppgcl,dongalia.
Rate contract for complete repairing/rewinding of bhel make 100 kva transformer rectifier of esp system at 2x600 mw, sstpp,mppgcl,dongalia.
Read moreWork contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Work contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Read moreWork contract for maintenance of different types of equipments at 132kv switch yard of 2x10 mw, bhps iv, mppgcl, jhinna
Work contract for maintenance of different types of equipments at 132kv switch yard of 2x10 mw, bhps iv, mppgcl, jhinna
Read moreWork contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Read moreWork contract for repairing of damaged final drive assembly along with supply of new spares in place of damaged spares of san make locomotive for chp-i , sstpp, mppgcl, dongalia
Work contract for repairing of damaged final drive assembly along with supply of new spares in place of damaged spares of san make locomotive for chp-i , sstpp, mppgcl, dongalia
Read moreWork services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Work services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Read moreExecution of work under mw (conservation) to providing s.s. railing to booking counter for controlling tourist and other necessary work at elephanta caves, dist-raigad. (f.y.2024-2025). as specified in the boq.
Execution of work under mw (conservation) to providing s.s. railing to booking counter for controlling tourist and other necessary work at elephanta caves, dist-raigad. (f.y.2024-2025). as specified in the boq.
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreWork of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Work of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Read moreRoutine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Routine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Read moreof your Industry type