Tender Details
Particulars | Details |
---|---|
Title |
Kharkara Hansi1,Construction Work On Manna Panna Dhanak Choupal (Vangy)
|
Description |
Kharkara Hansi1,Construction Work On Manna Panna Dhanak Choupal (Vangy)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_292676_1 |
Reference Number |
2023BE3664BE 9CEE 4844 9420 55393859D10A699DEV |
Tender Fee | 500 |
EMD | 22668 |
Tender Value | |
Place | Executive Engineer Hisar |
Link | https://etenders.hry.nic.in |
Start Date | June 23, 2023 14:30 |
End Date |
06/07/2023 ( Expired 695 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of drain covers for drainage and cc work on road side area at 220kv substation, piran kaliyar.
Construction of drain covers for drainage and cc work on road side area at 220kv substation, piran kaliyar.
Read moreConstruction work on trenching ground at badagaow
Construction work on trenching ground at badagaon
Read moreConstruction work of culvert in the remaining part under the flyover on hariparvat zone, sikandra industrial area master plan road.
Construction work of culvert in the remaining part under the flyover on hariparvat zone, sikandra industrial area master plan road.
Read moreUrgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)
Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)
Read moreStreet light construction work on both sides of jirapur-pachaur main road under municipal area
Street light construction work on both sides of jirapur-pachaur main road under municipal area
Read moreConstruction work of community building on government land adjacent to the public toilet behind the arya samaj temple under dr. george disilva ward. zone 04..
Construction work of community building on &#x0d government land adjacent to the public toilet &#x0d behind the arya samaj temple under dr. george &#x0d disilva ward. zone 04..&#x0d
Read moreOn turnkey basis construction of gagorani barrage (with gates), as per detailed scope of work but not limited to that
On turnkey basis construction of gagorani barrage (with gates), as per detailed scope of work but not limited to that
Read moreUnder operation kayakalp, the remaining work under rejuvenation in the primary school in ward 20 azamnagar kotwali, the work of painting, whitewashing etc., construction of boundary wall on one side, kitchen and urinals for boys and girls.
Under operation kayakalp, the remaining work under rejuvenation in the primary school in ward 20 azamnagar kotwali, the work of painting, whitewashing etc., construction of boundary wall on one side, kitchen and urinals for boys and girls.
Read moreof your Industry type