Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Bm Unit I To Iv Boiler Pressure Parts Safety Valve Floating During Aoh 2025
|
Description |
Mtps I Bm Unit I To Iv Boiler Pressure Parts Safety Valve Floating During Aoh 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | June 26, 2025 17:30 |
End Date |
10/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Requirement of c and s make spares for lt swgr, esp and dc system, river water system and chp of unit-i to iv of ctpp chhabra
Requirement of c and s make spares for lt swgr, esp and dc system, river water system and chp of unit-i to iv of ctpp chhabra
Read moreService contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Service contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreMtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Mtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Read moreMtps i oahs pdfacs unit iii mtps i till the period to dispose dry fly ash quantity of 110900 mt phase-i
Mtps i oahs pdfacs unit iii mtps i till the period to dispose dry fly ash quantity of 110900 mt phase-i
Read moreMtps i bm rotating parts units i and ii load testing and certification of movable trolleys chain blocks located above primary air fan forced draft fan aph induced draft fan and esp area
Mtps i bm rotating parts units i and ii load testing and certification of movable trolleys chain blocks located above primary air fan forced draft fan aph induced draft fan and esp area
Read moreMtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Read moreSupply of spare parts of vt pump at ps i to ps iv of ksl canal for the year 2025-26
Supply of spare parts of vt pump at ps i to ps iv of ksl canal for the year 2025-26
Read moreMtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Read moreMtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreof your Industry type