Title
33k V Substation Urumi Civil Work For The Construction Of New Control Room Building
Description
Earthwork Excavation Random Rubble Masonry Filling Quarry Muck Pcc Centering And Shuttering Rcc Filling Earth Aluminum Work Solid Block Masonry Sanitary Fittings Installing Septic Tank Placing Water Storage Tank Plastering Painting Etc
Organisation Government of Kerala
Tender Id 2023_KSEB_584018_1
Reference
Number
CSDN/ Etender/ 06/2023-24 dated 24.06.2023
Tender Fee 5900
EMD 50000
Tender Value
Place Transmission Civil Subdivision Nallalam Kozhikode
Link https://etenders.kerala.gov.in
Start Date June 26, 2023 15:30
End Date

12/07/2023 ( Expired 702 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Construction of 3 new ferryboats

Construction of 3 new ferryboats

Read more
Jp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise