Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Laying Cement Concrete 1 3 6 In The Base Of Wire Crate Including Earth Filling Work At Village Retihal Badhu In Thesil Ghumarwin Distt Bilaspur
|
| Description |
Sh Balance Work 2nd Step From Rd 0 0 To 40 Mtr Under Ncrf
|
| Organisation | HP Irrigation and Public Health | State Govt. and UT |
| Tender Id | 2025_HPIPH_101963_1 |
|
Reference Number |
GMR-BLP02-737(12452-90)WireCT |
| Tender Fee | 500 |
| EMD | 15500 |
| Tender Value | - |
| Place | GHUMARWIN |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149900 |
| Start Date | March 13, 2025 22:30 |
| End Date |
Expired
20/03/2025
Expired 577 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs to store at bijbehara including filling cement bags with sand/earth
Repairs to store at bijbehara including filling cement bags with sand/earth
Read moreRepairs to store at bijbehara including filling cement bags with sand/earth
Repairs to store at bijbehara including filling cement bags with sand/earth
Read moreEarth filling, wire fencing and gsb work under mla fund in mundla school
Earth filling, wire fencing and gsb work under mla fund in mundla school
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreAngle 10x1x1,t angle 15x1x1,t angle 24x1x1,ceiling 24x24,wall plug 1pt25 inch,banding wire aluminum,neel powder 250 gm pkt,thread nylon,metal scissor,wooden screw steel 1pt25 inch long,plywood 6x4x19mm,nails 2 inch long,ms sqr 1x1x3mm,favicol hs,wooden screw 19mm long,handel 3 inch long with screw,magnet catcher 2 inch long with screw,piano hinge 4x19mm,ceiling fan regulator modular type,modular indicator,tmt bar 10mm,tiles 1x1,cement,sand,aggregate 63mm,aggregate 20mm,ms pipe sqr is 4923 yst 310 3 inch x 3mm,ms angle 35x35x5mm,ms flat 2x5mm,ms base plate 1x1x3mm,foundation bolt 18x16mm,welding rod size 3pt15mm,cutting disc 14 inch,cutting disc 4 inch,grinding disc 8 inch,grinding disc 4 inch,hand gloves,ppgi sheet 12x3pt5x5mm,self taping screw 1 inch 100 pieces per pkt,self taping screw 2 inch 100 pieces per pkt,self taping screw 3 inch 100 pieces per pkt,adopter 8mm,ridge 10x1x1,m seal,black paint,red oxide,turpentine oil,painting brush 2 inch,pvc single core ms copper wire 1 sqmm,pvc single core ms cop
Angle 10x1x1,t angle 15x1x1,t angle 24x1x1,ceiling 24x24,wall plug 1pt25 inch,banding wire aluminum,neel powder 250 gm pkt,thread nylon,metal scissor,wooden screw steel 1pt25 inch long,plywood 6x4x19mm,nails 2 inch long,ms sqr 1x1x3mm,favicol hs,wooden screw 19mm long,handel 3 inch long with screw,magnet catcher 2 inch long with screw,piano hinge 4x19mm,ceiling fan regulator modular type,modular indicator,tmt bar 10mm,tiles 1x1,cement,sand,aggregate 63mm,aggregate 20mm,ms pipe sqr is 4923 yst 310 3 inch x 3mm,ms angle 35x35x5mm,ms flat 2x5mm,ms base plate 1x1x3mm,foundation bolt 18x16mm,welding rod size 3pt15mm,cutting disc 14 inch,cutting disc 4 inch,grinding disc 8 inch,grinding disc 4 inch,hand gloves,ppgi sheet 12x3pt5x5mm,self taping screw 1 inch 100 pieces per pkt,self taping screw 2 inch 100 pieces per pkt,self taping screw 3 inch 100 pieces per pkt,adopter 8mm,ridge 10x1x1,m seal,black paint,red oxide,turpentine oil,painting brush 2 inch,pvc single core ms copper wire 1 sqmm,pvc single core ms cop
Read moreProviding laying cement conc 1 3 6 in the base of wire crate filling earth behind wire crate construction of culvert crossing waste water and wire crate from rd 42 50 to 53 75 mtr at village retail baddu in tehsil ghumarwin distt bilaspur hp
Balance work under ncrf
Read moreConstruction of wire crate work to check the erosion down stream side of rcc dyke near mela ground in tehsil ghumarwin distt bilaspur sh providing and laying c c 1 3 6 in the base of wire crate construction of wire crate from rd 0 to 23 25
Construction of wire crate work to check the erosion down stream side of rcc dyke near mela ground in tehsil ghumarwin distt bilaspur sh providing and laying c c 1 3 6 in the base of wire crate construction of wire crate from rd 0 to 23 25
Read moreConstruction of rain water harvesting structure rcc dykes over across seer khad for recharging various irrigation and water supply scheme in thesil ghumarwin distt bilaspur
Sh construction of rcc dyke across seer khad near mela ground ghumarwin&#x0d &#x0d
Read moreof your Industry type