Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
State Plan 2023 24 Tss Supply Erection Trial And Commissioning Of Dry Well Submersible Stand By Pump At Murinjapalam Pump House Sewerage Work
|
| Description |
State Plan 2023 24 Tss Supply Erection Trial And Commissioning Of Dry Well Submersible Stand By Pump At Murinjapalam Pump House Sewerage Work
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2025_KWA_781449_1 |
|
Reference Number |
WRD/KWA-CE(SR)/TR/19179/2023RC 1/1 |
| Tender Fee | 2760 |
| EMD | 40588 |
| Tender Value | |
| Place | Thiruvananthapuram |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1281457 |
| Start Date | August 01, 2025 20:30 |
| End Date |
Expired
14/08/2025
Expired 314 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Construction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Read moreSupply, erection and commissioning of semi-automatic fly ash bricks manufacturing machine at brbcl nabinagar
Supply, erection and commissioning of semi-automatic fly ash bricks manufacturing machine at brbcl nabinagar
Read moreJob work for repair of 20hp filling pump at mumbai port model all complete as directed by engineer in charge at cwprs pune 24
Job work for repair of 20hp filling pump
 at mumbai port model all complete as
 directed by engineer in charge at cwprs
 pune 24
Read moreDesign, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches sprinkling system and automation using of self dynamic hydro control val
Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches 
 sprinkling system and automation using of self dynamic hydro control val
Read moreRepair / repalcement of amf panel, yield test of bore, cleaning of bore, maintenance of pump house and allied work at af stn bhowali.
Repair / repalcement of amf panel, yield test of bore, cleaning of bore, maintenance of pump house and allied work at af stn bhowali.
Read moreLac-ads-guruvayur lac 2025-26-supply installation testing and commissioning of 160 kva dg at newly constructed court complex, chavakkad.-work-general electrical work
Lac-ads-guruvayur lac 2025-26-supply installation testing and commissioning of 160 kva dg at newly constructed court complex, chavakkad.-work-general electrical work
Read moreComplete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Read moreSupply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Read moreSupply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Read moreMajor works water supply scheme south tripura district replacement of 1 dtw sh construction of pump house pipeline laying for reconnection from new spot to existing pipeline and allied works at ongc gajalia nabagram gp satchand rd block 2026 27
Major works water supply scheme south tripura district replacement of 1 dtw sh construction of pump house pipeline laying for reconnection from new spot to existing pipeline and allied works at ongc gajalia nabagram gp satchand rd block 2026 27
Read moreof your Industry type