Tender Details
Particulars | Details |
---|---|
Title |
Making Of Two Nos. Concrete Foundation For Acb And Tsu Base And Prepare Of Track Line For 13 West Proposed Depillaring Panel In Masan Combined Seam At Shiwani Ug Mine.
|
Description |
Making Of Two Nos. Concrete Foundation For Acb And Tsu Base And Prepare Of Track Line For 13 West Proposed Depillaring Panel In Masan Combined Seam At Shiwani Ug Mine.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_320875_1 |
Reference Number |
GM/BHAT/SUR/e-Tender/24-25/17 Dt 09.11.24 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | Shiwani Ug Mine, Bhatgaon Area, |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=332636 |
Start Date | November 12, 2024 15:30 |
End Date |
22/11/2024 ( Expired 201 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 18 nos. rcc isolation stoppings in proposed depillaring panel 31lw/19d of mk(top) seam in bartarai colliery of amadand ug sub area.
Construction of 18 nos. rcc isolation stoppings in proposed depillaring panel 31lw/19d of mk(top) seam in bartarai colliery of amadand ug sub area.
Read moreConstruction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Construction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Read moreConstruction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Construction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Read moreConstruction of 12 nos of isolation stopping for finally seal of proposed depillaring working panel vibe 12 of burhar vi seam at damini ug mine
Construction of 12 nos of isolation stopping for finally
 seal of proposed depillaring working panel vibe 12 of
 burhar vi seam at damini ug mine
Read moreInstallation and dismantling of 800mm drive head installation of belt conveyors and establishing of haulage track line in proposed working panel at damini ug mine at sohagpur area
Installation and dismantling of 800mm drive head installation of belt conveyors and establishing of haulage track line in proposed working panel at damini ug mine at sohagpur area
Read moreConstruction of foundation/ plate from for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Construction of foundation/ platefrom for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Read moreConstruction of 12 nos. isolation stoppings of proposed depillaring panel vibe12 of burhar vi bottom seam at damni ug mine
Construction of 12 nos. isolation stoppings of proposed depillaring panel vibe12 of burhar vi bottom seam at damni ug mine
Read moreProposal of installation and dismantling of 800mm drive head installation of belt conveyors and establishing of haulage track line in proposed working panel at damini ug mine at sohagpur area.
Proposal of installation and
 dismantling of 800mm drive head
 installation of belt conveyors and
 establishing of haulage track line in
 proposed working panel at damini
 ug mine at sohagpur area
Read moreTo assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
To assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
Read moreof your Industry type