Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission Jjm Laying Pipe Lines For Supply Improvement In Kattakambal Panchayath Additinal Work Vi Road Restoration Works Chirakkal Centre To Pengamuk Road Chirakkal Centre To Vaykadavu Road At Kattakambal Panchayath Supplying And Laying
|
Description |
Jal Jeevan Mission Jjm Laying Pipe Lines For Supply Improvement In Kattakambal Panchayath Additinal Work Vi Road Restoration Works Chirakkal Centre To Pengamuk Road Chirakkal Centre To Vaykadavu Road At Kattakambal Panchayath Supplying And Laying
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_596554_1 |
Reference Number |
83/EE/PHD/TSR/2023-24 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | KWA,PH DIVISION,THRISSUR |
Link | https://etenders.kerala.gov.in |
Start Date | August 18, 2023 20:30 |
End Date |
25/08/2023 ( Expired 643 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreS and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreDi pipe
Supply and delivery at site of isi mark socket and spigot jointing system, centrifugally cast k7 and k9 pipes conforming to is 8329 2000 with latest amendments in standard length as per nieq within jiaganj azanj municipal area for water supply
Read moreAAAAAAAAAA
Login to viewSupply, delivery and laying of 600mm diameter ms pipeline beside 4no. bridge by hdd method across the railway and other obstacles portion for improvement of filtered water supply at eastern part of the 4no. bridge in ward no. 59 and 65.
Read moreImprovement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Read moreEngagement of supply labours for carpentry work and sewerage lines of plant including regular cleaning of toilets of ash slurry pump house,
Engagement of supply labours for carpentry work and sewerage lines of plant
 including regular cleaning of toilets of ash slurry pump house, 24x7 store and
 dumping of rubbish and waste materials into nearby dustbin at btps, bokaro
Read moreof your Industry type