Tender Details
Particulars | Details |
---|---|
Title |
White Washing Single Coat Along Main Line District Belt, Haulage And Traveling Roadways And Belt, Haulage And Traveling Roadways Of 40 D/ Main Dip District, Main Line And Cross Galleries Of Above At Rehar Ug Mine, Of Bishrampur Area.
|
Description |
White Washing Single Coat Along Main Line District Belt, Haulage And Traveling Roadways And Belt, Haulage And Traveling Roadways Of 40 D/ Main Dip District, Main Line And Cross Galleries Of Above At Rehar Ug Mine, Of Bishrampur Area.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_325952_1 |
Reference Number |
GM/BSPR/GMO/Srvy/e-tender/ 2024-25/26 dt.16.01.25 |
Tender Fee | 0 |
EMD | 12700 |
Tender Value | |
Place | REHAR UG MINE OF SECL BISHRAMPUR AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337868 |
Start Date | January 18, 2025 15:30 |
End Date |
28/01/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreWhite washing along travelling roadway and haulage roadway for proposed panel no nk s in kenda seam working of nj unit of bahula colliery under kenda area ecl
White washing along travelling roadway and haulage roadway for proposed panel no nk s in kenda seam working of nj unit of bahula colliery under kenda area ecl
Read moreConstruction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.
Construction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreWidening of main riding haulage room, strengthening of bunker and trestle with other misc. work at shivani u.g. mine premises of kalyani sub area of bhatgaon area.
Widening of main riding haulage room, strengthening of bunker and trestle with other misc. work at shivani u.g. mine premises of kalyani sub area of bhatgaon area.
Read moreInstallation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Read moreTransportation and installation of 1000 gpm pump with motor at 1dip/84 l main dip sump including transportation, laying and joining of 6 inch delivery pipe line from 1dip/50l to 1dip/84l and 50l east district in seam 1 combined (top seam) at gayatri
Transportation and installation of 1000 gpm pump with motor at 1dip/84 l main dip sump including transportation, laying and joining of 6 inch delivery pipe line from 1dip/50l to 1dip/84l and 50l east district in seam 1 combined (top seam) at gayatri
Read moreRenovation and maintenance of existing sub area managers office, vp ug mine no 02 safety office and mine managers office and shivpuri open casts mine manager office along with toilets at shivpuri sub area under pench area.
Renovation and maintenance of existing sub area managers office, vp ug mine no 02 safety office and mine managers office and shivpuri open casts mine manager office along with toilets at shivpuri sub area under pench area.
Read moreRepairing and maintenance of lt and ht o/h line for power supply to weighbridge at near nkssy coal dump and l,t o/h line at k.k.c main siding and other miscellaneous work etc. at abocp mine under block-ii area
Repairing and maintenance of lt and ht o/h line for power supply to weighbridge at near nkssy coal dump and l,t o/h line at k.k.c main siding and other miscellaneous work etc. at abocp mine under block-ii area
Read moreof your Industry type