Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 04 (Four) Nos. Rcc Isolation Stopping For
|
| Description |
Construction Of 04 (Four) Nos. Rcc Isolation Stopping For
Sealing P 8 B Proposed Depillaring Panel In L.K. Ii Seam Of Jamuna
9and10 Mine, Bhadra Sub Area, Jk Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_302429_1 |
|
Reference Number |
SECL/JK/GM(O)/23-24/eT/42 DT. 23.02.24 |
| Tender Fee | 0 |
| EMD | 6100 |
| Tender Value | |
| Place | Jamuna 9/10 Mine, Bhadra Sub Area, JK Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313290 |
| Start Date | February 24, 2024 19:00 |
| End Date |
Expired
06/03/2024
Expired 866 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreMane colony khandala dist-satara
Water supply scheme for 61 nos rehabilitated families from vele village tal-jaoli,dist-satara (full deposit work)
Read moreSupply and construction for artillery battery module
Supply and construction for artillery battery module
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreExtension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreConstruction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Read moreof your Industry type