Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bush Cutting At The Slope Of Ob Dump No. 06 And 07 And Near Dozer And Dumper Section Under Kathara Colliery
|
| Description |
Bush Cutting At The Slope Of Ob Dump No. 06 And 07 And Near Dozer And Dumper Section Under Kathara Colliery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_317822_1 |
|
Reference Number |
PO/KTC/PE (C)/E-Tender/24-25/29 Dt-19.09.2024 |
| Tender Fee | 0 |
| EMD | 4500 |
| Tender Value | - |
| Place | Kathara Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329409 |
| Start Date | September 20, 2024 15:30 |
| End Date |
Expired
30/09/2024
Expired 745 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreBush cutting in between grid e 3189750 to 3190300 in existing oc mine and o.b dump of kathara colliery
Bush cutting in between grid e 3189750 to 3190300 in existing oc mine and o.b dump of kathara colliery
Read moreCutting and filling of fire zone area near 09 no ob dump at chapaur colliery.
Cutting and filling of fire zone area near 09 no ob dump at chapaur colliery.
Read moreCleaning of catch drain and extension along the ob dump no. 08 in front of pit office under kathara colliery
Cleaning of catch drain and extension along the ob dump no. 08 in front of pit office under kathara colliery
Read moreRepairing of water reservoir of washing plant and bush cutting and cleaning in base workshop under kathara colliery, kathara area
Repairing of water reservoir of washing plant and bush cutting and cleaning in base workshop under kathara colliery, kathara area
Read moreConstruction of toe wall beside reliance ob dump under kapasara colliery.
Construction of toe wall beside reliance ob dump under kapasara colliery.
Read morePcc work at dozer section parking area at kathara colliery
Pcc work at dozer section parking area at kathara colliery
Read morePcc work at dozer section parking area at kathara colliery
Pcc work at dozer section parking area at kathara colliery
Read morePcc work at dozer section parking area at kathara colliery
Pcc work at dozer section parking area at kathara colliery
Read moreof your Industry type