Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A Mtc Of Ephs Sewerage In Sector11 Ue Panipat
|
| Description |
Cleaning Of Silt Malba From Various Sewer Manholes Complete In All Respects And All Other Works Contingent Thereto
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HBC_328550_1 |
|
Reference Number |
Job No. EE, HSVP/PPT/2023-24/120. |
| Tender Fee | 250 |
| EMD | 1960 |
| Tender Value | - |
| Place | EXECUTIVE ENGINEER HSVP DIVISION PANIPAT |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | November 14, 2023 22:40 |
| End Date |
Expired
23/11/2023
Expired 1034 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model
Read moreSewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model
Sewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model
Read moreSewerage projects in 44 ulbs under sbm 2.0 under the jurisdiction of sangareddy, rangareddy, nizamabad and mahabubnagar ph divisions (package-iii) under ls contract system with hybrid annuity model
Sewerage projects in 44 ulbs under sbm 2.0 under the jurisdiction of sangareddy, rangareddy, nizamabad and mahabubnagar ph divisions (package-iii) under ls contract system with hybrid annuity model
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreReactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Reactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Read moreRequest for proposal (rfp) for the establishment and operation of a co-educational centre of excellence (coe) for sc & st students
Request for proposal (rfp) for the establishment and operation of a co-educational centre of excellence (coe) for sc & st students
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type