Tender Details

About Tender

🚂 Invitation For Bids: Rail Renewal Project In Gorakhpur 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids From Eligible Contractors For The Comprehensive Rail Renewal Project Spanning 16.70 Km. Within The Jurisdiction Of Sr. Den/I/Ljn. 🗺️ 📅 Bid Submission Deadline: July 19, 2024, 3:00 Pm A Tender Fee Of Inr 2,80,600 Is Applicable As Earnest Money Deposit (Emd). Interested Contractors Must Review The Complete Tender Documents For Detailed Project Specifications, Scope, And Submission Guidelines. Keywords: Rail Renewal, Infrastructure, Construction, Ministry Of Railways, Central Government, Tender, Emd, Gorakhpur
Particulars Details
Title
Rail Renewal In Jurisdiction Of Sr. Den/I/Ljn (16.70 Km.)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75247528
Reference
Number
NER-LJN-2024-94
Tender Fee 0
EMD 2.81 Lakh
Tender Value -
Place Gorakhpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75247528/viewNitPdf_4578958.pdf

Start Date June 14, 2024 22:57
End Date
Expired 19/07/2024

Expired 771 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Renewal of road hanagal-tadas padubidri chikkalagudda statehighway sh-01 from km 285.21 to km 316.30 in shiggaon constituency

Renewal of road hanagal-tadas padubidri chikkalagudda statehighway sh-01 from km 285.21 to km 316.30 in shiggaon constituency

Read more
Annual maintenance of road from vaderahalli connecting pennamahalli (upto karnataka/ap border) via j b halli,pakkurthy, rampura, k k pura, thimmalapura road from 0.00 to 5.90, 6.25 to 6.50, 6.6 to7.1 ,8.50 to 11.28, 11.70 to 12.10, 13.20 to 14.05 ,15.95 to 16.70 and 17.65 to 21.19 km in molalkalmuru taluk.

Annual maintenance of road from vaderahalli connecting pennamahalli (upto karnataka/ap border) via j b halli,pakkurthy, rampura, k k pura, thimmalapura road from 0.00 to 5.90, 6.25 to 6.50, 6.6 to7.1 ,8.50 to 11.28, 11.70 to 12.10, 13.20 to 14.05 ,15.95 to 16.70 and 17.65 to 21.19 km in molalkalmuru taluk.

Read more
Resurvey of humcha rf block i & ii reserved forest, with its boundary length measuring approximately 23.50 km in hosanagara range, sagara division, during 2026-27.

Resurvey of humcha rf block i & ii reserved forest, with its boundary length measuring approximately 23.50 km in hosanagara range, sagara division, during 2026-27.

Read more
Resurvey of neralamane rf block i & ii reserved forest, with its boundary length measuring approximately 31.70 km in hosanagara range, sagara division, during 2026-27.

Resurvey of neralamane rf block i & ii reserved forest, with its boundary length measuring approximately 31.70 km in hosanagara range, sagara division, during 2026-27.

Read more
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.

Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.

Read more
Resurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of uruval block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 28.10 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of uruval block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 28.10 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise