Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening, Repair And Maintenance Of 72 No Old Twin Moulds 9m Long Including Reinstallation Of New Bottom Supports For 72 No Old Twin Moulds 9m Long And Supply Of New End Plates For 147 No Twin Moulds 9m Long At Pilot Workshop, Sri Muktsar Sahib
|
| Description |
Strengthening, Repair And Maintenance Of 72 No Old Twin Moulds 9m Long Including Reinstallation Of New Bottom Supports For 72 No Old Twin Moulds 9m Long And Supply Of New End Plates For 147 No Twin Moulds 9m Long At Pilot Workshop, Sri Muktsar Sahib
|
| Organisation | Government of Punjab |
| Tender Id | 2024_POWER_115054_1 |
|
Reference Number |
TE No- 07/PWMKS/2023-24 |
| Tender Fee | 1180 |
| EMD | 28000 |
| Tender Value | - |
| Place | SRI MUKTSAR SAHIB |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | January 05, 2024 22:00 |
| End Date |
Expired
02/02/2024
Expired 986 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and maintenance of 216 no old twin moulds 9m long including re-installation of defected bottom supports for 216 no old twin moulds 9m long and supply of new end plates for 151 no twin moulds 9m long at pilot workshop sri muktsar sahib
Repair and maintenance of 216 no old twin moulds 9m long including re-installation of defected bottom supports for 216 no old twin moulds 9m long and supply of new end plates for 151 no twin moulds 9m long at pilot workshop, sri muktsar sahib
Read moreRestrengthening and uplifting of 160 nos twin moulds for manufacturing of 9mlong pcc poles including supply and fitting of new end plates for 160 nos twin moulds 9m long at pilot workshop, sarna pathankot
Restrengthening and uplifting of 160 nos twin moulds for manufacturing of 9mlong&#x0d pcc poles including supply and fitting of new end plates for 160 nos twin moulds&#x0d 9m long at pilot workshop, sarna pathankot
Read moreRe-strengthening and re-alignment of existing 180 nos 9m twin moulds and fixing the moulds on bed to proper level at pilot workshop sas nagar (mohali) during 2025-26
All works related to re-strengthening and re-alignment of existing 180 nos 9m twin moulds and fixing the moulds on bed to proper level at pilot workshop sas nagar (mohali) during 2025-26
Read moreof your Industry type