Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 02 Nos. Of Ramps In Ipd Building In Aiims, Nagpur (Maharashtra) And Their Maintenance During Defect Liability Period.
|
| Description |
Construction Of 02 Nos. Of Ramps In Ipd Building In Aiims, Nagpur (Maharashtra) And Their Maintenance During Defect Liability Period.
|
| Organisation | HSCC(I) Ltd | Central Govt. Ministry/Department |
| Tender Id | 2025_HSCC_804370_1 |
|
Reference Number |
HSCC/AIIMS/NAGPUR /CIVIL/RAMP/2025/119 |
| Tender Fee | 5900 |
| EMD | 27.36 Lakh |
| Tender Value | - |
| Place | AIIMS, Nagpur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1109059 |
| Start Date | July 07, 2025 23:30 |
| End Date |
Expired
21/07/2025
Expired 448 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Supply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreWork descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Work descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Read moreMaintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreConstruction of two (02) nos ramps and boundary wall at aiims kalyani (west bengal) and their maintenance during defect liability period.
Construction of two (02) nos ramps and boundary wall at aiims kalyani (west bengal) and their maintenance during defect liability period.
Read moreConstruction of 250 bedded vishram sadan at aiims bilaspur, himachal pradesh and their maintenance during defect liability period.
Construction of 250 bedded vishram sadan at aiims bilaspur, himachal pradesh and their maintenance during defect liability period.
Read moreAmendment01 external development works at all india institute of medical sciences (aiims), raebareli (u.p.) and their maintenance during defect liability period.
Amendment01 external development works at all india institute of medical sciences (aiims), raebareli (u.p.) and their maintenance during defect liability period.
Read moreof your Industry type