Tender Details

Particulars Details
Title
Balance Work For Outsourcing Of Loco Operation With Technological Support (Package Ii) (Zone Rmp/Central/Sms I (Highline) Of Sail/Bsl)
Description
Balance Work For Outsourcing Of Loco Operation With Technological Support (Package Ii) (Zone Rmp/Central/Sms I (Highline) Of Sail/Bsl)
Organisation Hindustan Steelworks Construction Limited | Central Govt. Ministry/Department
Tender Id 2024_HSCL_797711_1
Reference
Number
HSCL/EZ/BKSC/Traffic/2024/e502 Dt. 27.02.24
Tender Fee 9440
EMD 4.33 Lakh
Tender Value
Place HSCL Bokaro
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838594
Start Date February 28, 2024 00:00
End Date

12/03/2024 ( Expired 481 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Read more
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Read more
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur

Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur

Read more
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a

Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a

Read more
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b

Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b

Read more
Design, construction, testing, commissioning and operation and maintenance of internal infrastructure works for pm mitra park dhar (mp) package i on epc basis

Design, construction, testing, commissioning and operation and maintenance of internal infrastructure works for pm mitra park dhar (mp) package i on epc basis

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
Lot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise