Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Foundation And Roof For Electrolyser Plant At Moula Ali Ctm Site
|
| Description |
Construction Of Foundation And Roof For Electrolyser Plant At Moula Ali Ctm Site
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_49056_1 |
|
Reference Number |
702500181 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | BHEL Corporate RND, Vikasnagar, Hyderabad 500042 |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52557 |
| Start Date | May 30, 2025 23:15 |
| End Date |
Expired
09/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Permanent restoration of roads from link road gather nalla via dhanda to subha wali sanai upto jamia masjid moula ali
Permanent restoration of roads from link road gather nalla via dhanda to subha wali sanai upto jamia masjid moula ali
Read moreEstimate for drilling of 6 5 dia borewell supply delivery and erection of suitable submersible pump set with accessories and laying and jointing of hdpe pipe line work at defence colony park ward no 188 c 4 moula ali malkajgiri zone ubd mmc 2026
Estimate for drilling of 6 5 dia borewell supply delivery and erection of suitable submersible pump set with accessories and laying and jointing of hdpe pipe line work at defence colony park ward no 188 c 4 moula ali malkajgiri zone ubd mmc 2026
Read moreProposed accelerograph room at dam site and providing foundation and supporting arrangement for 03 nos. ews (early warning system) at teesta low dam-iv power station, kalijhora, west bengal
Proposed accelerograph room at dam site and providing foundation and supporting arrangement for 03 nos. ews (early warning system) at teesta low dam-iv power station, kalijhora, west bengal
Read moreArchitectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Read moreArchitectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Read moreDevelopment of new a site ro with facilities like sales building, canopy foundation, paver block driveway and other allied civil n electrical works at location km stone 330 to 335 rhs on nh-27 from lucknow to gopalganj, dist- kushinagar gorakhpur do
Development of new a site ro with facilities like sales building, canopy foundation, paver block driveway and other allied civil n electrical works at location km stone 330 to 335 rhs on nh-27 from lucknow to gopalganj, dist- kushinagar gorakhpur do
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreCivil works for foundation of dme separation pilot plant at moula-ali ctm site
Civil works for foundation of dme separation pilot plant at moula-ali ctm site
Read moreConstruction of drain at syed jaffer near masjid moula ali via ali park zadibal
Construction of drain at syed jaffer near masjid moula ali via ali park zadibal
Read moreof your Industry type