Tender Details

Particulars Details
Title
D.C. Motor Backed Battery Operated Pulling & Pushing Tug Of Icf And Lhb Bogies (As Per Specification)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106582550
Reference
Number
42245808B
Tender Fee 0
EMD 33240
Tender Value -
Place Jaipur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106582550/viewNitPdf_4838269.pdf

Start Date January 18, 2025 14:57
End Date
Expired 10/02/2025

Expired 613 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Secondary spring inner for non ac fiat bogies of lhb coaches to rcf drg. no-lg05100 alt-b confirming to rdso specification no. rdso/2017/cg-01 (rev.03).

Secondary spring inner for non ac fiat bogies of lhb coaches to rcf drg. no-lg05100 alt-b confirming to rdso specification no. rdso/2017/cg-01 (rev.03).

Read more
Set of switch plate assemblies for lhb eog non ac ls coaches with bus type window ( lsaybw )as per icf specification no. edml 003 rev.c

Set of switch plate assemblies for lhb eog non ac ls coaches with bus type window ( lsaybw )as per icf specification no. edml 003 rev.c

Read more
Stripping, scraping, cleaning and washing of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & painting of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & dismantling, scrapping, cleaning and painting of centre buffer coupler (cbc) of lhb & icf coaches during the various shop schedule.

Stripping, scraping, cleaning and washing of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & painting of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & dismantling, scrapping, cleaning and painting of centre buffer coupler (cbc) of lhb & icf coaches during the various shop schedule.

Read more
S.i.c. and proving out of manually operated welding manipulator/fixture/ for welding of brake beam with step stool as per attached specification no.-mcf/rbl/plan-41/ manipulator/fixture/ for welding of lhb brake beam /2025-2026 and drawing

S.i.c. and proving out of manually operated welding manipulator/fixture/ for welding of brake beam with step stool as per attached specification no.-mcf/rbl/plan-41/ manipulator/fixture/ for welding of lhb brake beam /2025-2026 and drawing

Read more
One coach set of air spring assembly (160 kn capacity) for main line/rajdhani lhb coaches for fiat type bogies as per rdso specification no. rdso/cg/s/23002, rev-1. scope of supply shall be as per specification rdso/cg/s/23002, rev-1 (each coach set will consists of four air spring assembly). packing instruction - mcf spi-042. (as) rdso item id: 3100341

One coach set of air spring assembly (160 kn capacity) for main line/rajdhani lhb coaches for fiat type bogies as per rdso specification no. rdso/cg/s/23002, rev-1. scope of supply shall be as per specification rdso/cg/s/23002, rev-1 (each coach set will consists of four air spring assembly). packing instruction - mcf spi-042. (as) rdso item id: 3100341

Read more
Supply and application of anti graffiti clear coat on lhb/icf/demu coaches as per annexure-1 on the exterior of railway coaches, conforming to rdso specification no. m&c/pcn/127-2020 (rev. 2.0) or latest with packing instruction p 1042 details as per scope of work includes.

Supply and application of anti graffiti clear coat on lhb/icf/demu coaches as per annexure-1 on the exterior of railway coaches, conforming to rdso specification no. m&c/pcn/127-2020 (rev. 2.0) or latest with packing instruction p 1042 details as per scope of work includes.

Read more
Bogie frame of lhb coaches drawing:-1. lw03007 - sheet 1 of 2 and 2 of 2 alt. g or 2.455-0-3-001 _ j _ icf _ sheet 1 of 2 & 2 of 2 alt ( k ) specification no:- mdts 213 rev.04, mdts-166 rev 02 special terms and conditions:- packing instruction: bogie frame of fiat bogie 1-all machined surface shall be applied with suitable rust preventive which shall prevent it from corrosion & oxidation for a minimum period of one year of storage 2-the packing shall be such that all the machined s

Bogie frame of lhb coaches drawing:-1. lw03007 - sheet 1 of 2 and 2 of 2 alt. g or 2.455-0-3-001 _ j _ icf _ sheet 1 of 2 & 2 of 2 alt ( k ) specification no:- mdts 213 rev.04, mdts-166 rev 02 special terms and conditions:- packing instruction: bogie frame of fiat bogie 1-all machined surface shall be applied with suitable rust preventive which shall prevent it from corrosion & oxidation for a minimum period of one year of storage 2-the packing shall be such that all the machined s

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise