Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Maintenance Of Complete Travelling Grate (Both Portions) Of Furnace For 125 Tph Boiler
|
| Description |
Repair And Maintenance Of Complete Travelling Grate (Both Portions) Of Furnace For 125 Tph Boiler
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_457769_1 |
|
Reference Number |
Repair and maintenance of complete Travelling Grate (both portions) of Furnace for 125 TPH Boiler |
| Tender Fee | 1280 |
| EMD | 0 |
| Tender Value | - |
| Place | The Shahabad Cooperative Sugar Mills Ltd |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=535479 |
| Start Date | July 11, 2025 16:30 |
| End Date |
Expired
23/07/2025
Expired 450 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Purchase of antiscalent and hydrochloric acid (hcl) for the operation of ro plant at 125 tph boiler
Purchase of antiscalent and hydrochloric acid (hcl) for the operation of ro plant at 125 tph boiler
Read moreCustom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 2 tph boiler qty 1 whole job,custom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 8 tph boiler qty 03 whole job,custom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 10 tph boiler qty 02 whole job
Custom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 2 tph boiler qty 1 whole job,custom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 8 tph boiler qty 03 whole job,custom bid for services - overhauling & maintenance of boiler and annual inspection through cib for 10 tph boiler qty 02 whole job
Read moreStuffing box barrel,plunger complete 125 mm dia 1129 mm long
Stuffing box barrel,plunger complete 125 mm dia 1129 mm long
Read moreComplete supply and installation of furnace flame viewing system at ntpctanda unit 5 and 6
Complete supply and installation of furnace flame viewing system at ntpctanda unit 5 and 6
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit fabrication work of economiser tube for 20 tph boiler service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit fabrication work of economiser tube for 20 tph boiler service provider
Read moreNit/pom-100990 for supply of complete cartridge assemblyfor boiler feed pump(bfp)
For procurement of complete cartridge assembly for boiler feed pump(bfp) of 250mw, unit-7, ptps, panipat.
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreStud tensioner with pump complete for boiler circulation pump (max load cap 2000kg. per cm2, wor
Stud tensioner with pump complete for boiler circulation pump (max load cap 2000kg. per cm2, wor
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreAvailing services of expert supervisory engineer for complete overhauling of boiler pressure part of ph-ii, 2x660mw, sstpp, mppgcl, dongalia.
Availing services of expert supervisory engineer for complete overhauling of boiler pressure part of ph-ii, 2x660mw, sstpp, mppgcl, dongalia.
Read moreof your Industry type