Tender Details

Particulars Details
Title
Electrical Work For 60 Bed Combined Running Room At Old Arm Building At Shalimar.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 83547565
Reference
Number
Elect-Chg_60BedSHM-17
Tender Fee 0
EMD 2.24 Lakh
Tender Value -
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/082025/83547565/viewNitPdf_5070544.pdf

Start Date August 07, 2025 16:37
End Date
Expired 29/08/2025

Expired 412 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Upgradation of running room at dnr by dismantling of old rr building and construction of 60 beded new running room at danapur.

Upgradation of running room at dnr by dismantling of old rr building and construction of 60 beded new running room at danapur.

Read more
Guntakal- upgradation of running room building by providing all specified facilities with 60 bed capacity with air conditioning - electrical arrangements.

Guntakal- upgradation of running room building by providing all specified facilities with 60 bed capacity with air conditioning - electrical arrangements.

Read more
Part(a):bina- construction of new running room (g+2) having 60 rooms with 2 bed each at east side of station. site area 3701.76 sqm.part(b): itarsi - construction of new running room (g+1) having 30 rooms with 2 bed each at old aden office, itarsi (gf & ff area-989.24sqm x 2 =1978.48sqm).part(c): et -capacity augmentation of new guard running room at itarsi, 6 rooms with 2 bed each, kitchen and dining at itarsi.part(d): bhopal - construction of new running room (g+1) having 35 room with 2

Part(a):bina- construction of new running room (g+2) having 60 rooms with 2 bed each at east side of station. site area 3701.76 sqm.part(b): itarsi - construction of new running room (g+1) having 30 rooms with 2 bed each at old aden office, itarsi (gf & ff area-989.24sqm x 2 =1978.48sqm).part(c): et -capacity augmentation of new guard running room at itarsi, 6 rooms with 2 bed each, kitchen and dining at itarsi.part(d): bhopal - construction of new running room (g+1) having 35 room with 2

Read more
Electrical (g) works in connection with the conversions of old rri cabin into crew lobby & old godown into running room at rksn.

Electrical (g) works in connection with the conversions of old rri cabin into crew lobby & old godown into running room at rksn.

Read more
Fixed bed catalytic reactor,advanced integrated biosel research and process development system,lab scale gasifier unit,electrocoagulation combined with membrane filtration,precision analytical balance

Fixed bed catalytic reactor,advanced integrated biosel research and process development system,lab scale gasifier unit,electrocoagulation combined with membrane filtration,precision analytical balance

Read more
Dharmavaram-upgradation of running room building by providing all specified facilities with 100 bed capacity with air conditioning - electrical arrangements.

Dharmavaram-upgradation of running room building by providing all specified facilities with 100 bed capacity with air conditioning - electrical arrangements.

Read more
Electrical work in connection with replacement of old and defective dg sets for emergency supply at running rooms at mtj.

Electrical work in connection with replacement of old and defective dg sets for emergency supply at running rooms at mtj.

Read more
A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail

A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail

Read more
Supply of automatic 4 section electro-mechanical high-end ot table - c arm compatible for surgery with buy back of two old ot tables

Supply of automatic 4 section electro-mechanical high-end ot table - c arm compatible for surgery with buy back of two old ot tables

Read more
General-klc-1 running maintenance contract for one year-administrative block, substation building , old and new museum, three nos quarters-rmc-general electrical work

General-klc-1 running maintenance contract for one year-administrative block, substation building , old and new museum, three nos quarters-rmc -general electrical work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise