Tender Details
Particulars | Details |
---|---|
Title |
Distribution Transformer, 3 Phase, 3.3 Kv, > 200 Kva Up To And Including 2500 Kva,Nflp Vcb 3.3 K V 6
|
Description |
|
Organisation | COAL INDIA LIMITED | Ministry of Coal |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 15:27 |
End Date |
20/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreRepairs and maint of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv/0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting, stud conservators and connected works
Repairs and maint of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv/0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting, stud conservators and connected works
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreComprehensive maintenance of 66 kv receiving station, provn of servo stabilizer (160 kva) to nfs building of 735 su and wiring in tech area at af stn adampur
Comprehensive maintenance of 66 kv receiving station, provn of servo stabilizer (160 kva) to nfs building of 735 su and wiring in tech area at af stn adampur
Read moreSupply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Read moreDistribution transformer, 3 phase, 3.3 kv, > 200 kva up to and including 2500 kva,nflp vcb 3.3 kv 6
Read more
Sitc of 1000 kva 11 - 0.433 kv step down transformer, lt panel 11 kv vcb panel and allied works at central electronics limited sahibabad
Sitc of 1000 kva 11 - 0.433 kv step down transformer, lt panel 11 kv vcb panel and allied works at central electronics limited sahibabad
Read moreof your Industry type