Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Restoration On Link Road From Rangas To Choru Via Kandrola Km 0/00 To 6/500.
|
| Description |
C/O V Shape Drain In Between Km 4/500 To 6/500, C/O R/Wall At Rd 4/465 To 4/470 And B/Wall At Rd 5/560 To 5/590). (Under Pdna 2025
|
| Organisation | PWD |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 500 |
| EMD | 28700 |
| Tender Value | 14.33 Lakh |
| Place | Himachal Pradesh |
| Link | Login to view |
| Start Date | October 09, 2026 17:30 |
| End Date |
Open
17/10/2026
4 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and restoration on link road from babe di kutia to choru via kohal batal km 0/00 to 2/500
C/o r/wall at rd 1/500 to 1/505, p/l gsb, wmm, m/t in between km 0/00 to 1/900)(under pdna 2025)
Read moreC/o link road from ramesh to gian house kandrola km 0/00 to 0/350
P/l cc pavement in km 0/00 to 0/350).
Read moreRestoration, rain damages on choru bhou jeehan road km 0/00 to 5/940.
C/o b/wall at rd 5/885 to 5/910).
Read moreC/o link road from nanoa bagh to shamshan ghat via badiyar km 0/00 to 1/500
Rofd in km 1/300 to 1/375, c/o v-shape drain, r/wall, hume pipe culvert m/t in between km 1/00 to 1/700).
Read moreRestoration of rain damage on link road to village patial basti km 0/00 to 1/500 (khera -i).
Providing and laying 25mm thick bituminous concrete in km 0/030 to 0/800) (under pdna 2025).
Read moreRestoration of link road bassi bhareri tatahar road 0 00 to 11/00 distt hamirpur hp
Sh c o r wall drain cross drainage under pdna 2023
Read moreRenewal work of the link road sandhari via pathari from km 0/00 to 7/00
Renewal work of the link road sandhari via pathari from km 0/00 to 7/00
Read moreC/o link road from molag to trivani mahadev temple km 0/00 to 4/00 (portion km 0/00 to 2/500)
F/c of road, road side structure and cross drainage work-mnp
Read moreC/o link road karsai to baturda via pump house km 0/00 to 0/800
C/o 6.00 mtr span rcc slab type culvert at rd 0315).
Read moreImprovement of link road from pechote to harot km 0/00 to 1/500.
Sh hiring of excavator cum loader pock lane/l and t rofd between km 0/00 to 0/510
Read moreof your Industry type