Tender Details
Particulars | Details |
---|---|
Title |
Supply And Installation Of 17 Pcs 9 Mtr High Octagonal Decorative Pole With 120 W Led Light From Gt Road Crossing To Chatak Cold
|
Description |
Supply And Installation Of 17 Pcs 9 Mtr High Octagonal Decorative Pole With 120 W Led Light From Gt Road Crossing To Chatak Cold&Amp#X0d
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2024_DOLBU_983726_1 |
Reference Number |
2024-25/11ET/09 |
Tender Fee | 856 |
EMD | 1.38 Lakh |
Tender Value | |
Place | gursahaiganj |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1762993 |
Start Date | January 22, 2025 20:30 |
End Date |
05/02/2025 ( Expired 125 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read morePre despatch inspection, supply, installation, commissioning and warranty of graphical application server setup with high bandwidth network
Pre-despatch inspection, supply, installation, commissioning and warranty of graphical application server setup with high bandwidth network
Read moreReplacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Survey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Read moreAddn altn to iron caging for transformer, provn of led search light for watch tower and special repairs replacement to garden light and road light under ge af chiloda
Addn altn to iron caging for transformer, provn of led search light for watch tower and special repairs replacement to garden light and road light under ge af chiloda
Read moreof your Industry type