Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
π Procurement Notice: Network Infrastructure Upgrade π§π The Department Of Atomic Energy, Under The Prime Minister's Office, Is Seeking Bids For The Procurement Of Network Layer 2 Access Switches And Associated Infrastructure. π₯οΈπ π Bid Submission Deadline: June 06, 2024, 12:00 Pm This Procurement Includes The Following Items: 1. Network Layer 2 Access Switches 2. Network Layer 2 Access Switches 3. 12 U Rack Enclosure 4. Cat6 Utp Cables Interested Bidders Should Provide Detailed Proposals, Including Technical Specifications, Pricing, And Implementation Timelines, To Meet The Department's Network Infrastructure Upgrade Requirements. Keywords: Network Layer 2 Access Switch, Rack Enclosure, Cat6 Utp, Department Of Atomic Energy, Pmo, Network Infrastructure Upgrade, Procurement Bid| Particulars | Details |
|---|---|
| Title |
1. Network Layer 2 Access Switch,2. Network Layer 2 Access Switch,3. 12 U Rack Enclosure,4. Cat6 Utp
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/4880310 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 15, 2024 17:12 |
| End Date |
Expired
06/06/2024
Expired 862 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Layer 2 gigabit switch,layer 2 gigabit switch,wireless access point,io box,networking utp cable box,utp patch cord,utp patch cord,utp patch panel,utp cable manager,wall mount rack,online 2kva ups with snmp card,pvc flat pipe,utp cabling work
Layer 2 gigabit switch,layer 2 gigabit switch,wireless access point,io box,networking utp cable box,utp patch cord,utp patch cord,utp patch panel,utp cable manager,wall mount rack,online 2kva ups with snmp card,pvc flat pipe,utp cabling work
Read moreLayer 2 access switch (v3),layer 3 managed network switches (core/distribution grade)
Layer 2 access switch (v3),layer 3 managed network switches (core/distribution grade)
Read moreRouter100g,l-3switchcore,l-2switch-48p,l-2switch-48p,sdn controller,video wall,network laptop,access point,wireless controller,dhcp server,rack-42,rack-36,rack-24,utpcat6a-cable,cat6-io,cat6amp-24p,cat6a-pc-7ft,cat6-pc-3ft,fibre liu,fibre pc,ofc cable,15kvaups,5 kva ups,l3 support,l2 support,l1support,layer 2 access switch (v3),high end laptop - notebook
Router100g,l-3switchcore,l-2switch-48p,l-2switch-48p,sdn controller,video wall,network laptop,access point,wireless controller,dhcp server,rack-42,rack-36,rack-24,utpcat6a-cable,cat6-io,cat6amp-24p,cat6a-pc-7ft,cat6-pc-3ft,fibre liu,fibre pc,ofc cable,15kvaups,5 kva ups,l3 support,l2 support,l1support,layer 2 access switch (v3),high end laptop - notebook
Read moreFirewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Firewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Read moreLayer 2 gigabit switch,wireless access point,online 2kva ups with snmp card,pvc flat pipe,utp cabling work
Layer 2 gigabit switch,wireless access point,online 2kva ups with snmp card,pvc flat pipe,utp cabling work
Read moreof your Industry type