Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of C.C. Road And Drain From House No. 5/472 To House No. 5/486 At Katara Itawari Khan Nai Ki Mandi, Agra.
|
Description |
Construction Of C.C. Road And Drain From House No. 5/472 To House No. 5/486 At Katara Itawari Khan Nai Ki Mandi, Agra.
|
Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
Tender Id | 2025_SCIDC_1040697_1 |
Reference Number |
33/MLC/AGRA/25-26 |
Tender Fee | 826 |
EMD | 7000 |
Tender Value | |
Place | Sikandra Agra |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1887704 |
Start Date | May 19, 2025 23:30 |
End Date |
26/05/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreE tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConstruction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.
Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read more10-rcc drain construction work from vijay yadav house to siraj gautam house on the right side of biribirhan road.
Rcc drain construction work from vijay yadav house to siraj gautam house on the right side of biribirhan road.
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreProviding and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Read moreof your Industry type