Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gear Driven Reverse,Gear Driven First,Gear Second Driven,Bushing,Gear Coupling 116 Tm52577,Gear Coup
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5685226 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 10, 2024 18:15 |
| End Date |
Expired
31/12/2024
Expired 652 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Obm 30hp 3303853720a8 carborator assy,obm 30hp 33-41263m spark plug holder,dozer 116tm03093 reverse gear bd 80 dozer,dozer 116tm51078 forward gear bd 80 dozer,dozer 116tm52577 gear coupling
Obm 30hp 3303853720a8 carborator assy,obm 30hp 33-41263m spark plug holder,dozer 116tm03093 reverse gear bd 80 dozer,dozer 116tm51078 forward gear bd 80 dozer,dozer 116tm52577 gear coupling
Read morePms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Pms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Read moreProcurement of gear coupling for ntpc farakka
Procurement of gear coupling for ntpc farakka
Read more1600067399 gear coupling fgc 9, with shear pin arrangement
1600067399 gear coupling fgc 9, with shear pin arrangement
Read moreInternal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Internal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreHp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Hp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Read moreProcurement of gear coupling gcc-108 installed at chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp, mppgcl, dongalia.
Procurement of gear coupling gcc-108 installed at chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp, mppgcl, dongalia.
Read moreDuplex oil cooler,fusible plug,seal ring,driven pinion,drive pinion,driven gear,drive gear,roll pin 0150,roll pin 030,bearing retainer ring,filter element,shaft seal ring,sleeve for scoop tube,bearing ring,retainer ring 0150,retainer ring 0090,spacer ring,slotted nut,isolating disc,o ring 250,o ring 252
Duplex oil cooler,fusible plug,seal ring,driven pinion,drive pinion,driven gear,drive gear,roll pin 0150,roll pin 030,bearing retainer ring,filter element,shaft seal ring,sleeve for scoop tube,bearing ring,retainer ring 0150,retainer ring 0090,spacer ring,slotted nut,isolating disc,o ring 250,o ring 252
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreof your Industry type