Tender Details
Particulars | Details |
---|---|
Title |
Bangalore Jolarpettai Section: Sw I: Construction Of Rcc Drain For A Length Of 1500m In Connection With The Work Of Through Ballast Recoupment Of Points And Crossings At Malur (Mlo), Devanagunthi (Dkn), Whitefield (Wfd), Whitefield Panel Cabin (Whpc) And Krishnarajapuram (Kjm) Yards Total 11 Nos In Sse/P.Way/Wfd Section. Maintenance Period Is 6months.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74006935 |
Reference Number |
06SBC24of07-03-2024-Item6 |
Tender Fee | 0 |
EMD | 2.1 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/74006935/viewNitPdf_4503368.pdf |
Start Date | March 07, 2024 23:10 |
End Date |
30/03/2024 ( Expired 388 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bangalore -jolarpettai section: sw-i: ttr of existing 52kg curved switch and cms crossings (d mark) with 52kg curved switch, cms and fsl at yards of tyakal-4nos, bangarpet-4nos, varadapura-1no and bisanattam-1no - total 10sets in sse/p.way/bangarpet section. sw-ii: ttr of existing 52kg curved switch and cms crossings (d mark) with 52kg curved switch and cms crossings - 10nos 1 in 8.5 in sse/p.way/whitefield section. (mlo-2nos, dkn-4nos, sgt-2nos, kjm/dsl-1no, kjm-1no). sw-iii: ttr of existi
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) thro
For complete deion and other details, please refer to tender
Read more(i) deep screening of track at various locations, station yards and points and crossings by bcm and manual methods in tpj division and (ii) destressing of lwr track for total length of 68.985km and deep screening of track by manual method at various location in sse/p.way/tpj section.
For complete deion and other details, please refer to tender
Read moreBangalore - jolarpettai section: sw-i: increasing of sleeper density of existing psc from 1540 sleepers/km to 1660 sleeper/km on up line at km 220/700-231/300 and 240/200-251/000 for a length of 21.4km in den/e/sbc section. sw-ii: bangalore -jolarpettai section: through ballast recoupment in points and crossings for 12nos.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: collection and supply of ballast including leading and loading at tcl depot (22,880 cum) in connection with the works of 1. ctr(s) for a length of 1.741kms in fci siding at kjm yard. 2. ctr(s) for a length of 7.05kms in fci siding at wfd yard.
For complete deion and other details, please refer to tender
Read moreSecunderabad division -wd-sc section: sw-i: section- improvements to yards including works like standardization of sand humps, buffer stops, over shoot lines , central drain works, re-spacing of points & crossings sleepers and other allied safety works for up keeping the quality of track in sse / p.way /vkb section under aden/vkb sub division in view of general manger s annual safety inspection. sw-ii: improvements to yards including works like standardization of sand humps, buffer st
For complete deion and other details, please refer to tender
Read moreWd-sc section: sw-i: improvements to yards including works like standardisation of sand humps, buffer stops, over shoot lines , central drain works, re-spacing of points & crossings sleepers and other allied safety works for up keeping the quality of track in sse / p.way /sem section under aden/tdu sub division in view of general manger s annual safety inspection.sw-ii:improvements to yards including works like standardisations of sand humps, buffer stops, over shoot lines , central d
For complete deion and other details, please refer to tender
Read more(i) deep screening of track at various locations, station yards and points and crossings by bcm and manual methods in tpj division and (ii) destressing of lwr track for total length of 68.985km and deep screening of track by manual method at various location in sse/p.way/tpj section.
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreof your Industry type