Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pcc Road At Natun Basti
|
| Description |
Pcc Road At Natun Basti
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_570757_4 |
|
Reference Number |
SGP/RNP-I/NIT(e)-04/2023-24 |
| Tender Fee | 500 |
| EMD | 4000 |
| Tender Value | - |
| Place | SANKA GP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 16, 2023 14:30 |
| End Date |
Expired
23/09/2023
Expired 1108 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreConst pcc road from natun bundh to hanuman mandir
Const pcc road from natun bundh to hanuman mandir
Read moreConstruction of natun basti awc at natun basti, jamarai para adc village under r.d. kanchanpur division during the year 2025-26.
Construction work
Read moreConstruction of pcc road from badal sing to sambhu sing at rangadih natun road
Construction of pcc road from badal sing to sambhu sing at rangadih natun road
Read morePcc road form thakur than to natun bandh at mudih bandwan(23-24)
Pcc road form thakur than to natun bandh at mudih bandwan(23-24)
Read moreConstruction of pcc road at ward no1 at kushwai basti
Construction of pcc road at ward no1 at kushwai basti
Read moreConstruction of pcc road from pcc road purana basti to piyakuri
Construction of pcc road from pcc road purana basti to piyakuri
Read moreConstruction of pcc from bartal to natun bundh at bararola
Construction of pcc from bartal to natun bundh at bararola
Read moreof your Industry type