Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of Acb Switch, Gate End Box, Trailing Cable, Radiant Drill Panel, Motor, Pumps, Tugger Haulage Etc At 4/5/6 And 7/8 Incline Of Dhori (K), Dhori Area For A Period Of Nine Months
|
| Description |
Shifting Of Acb Switch, Gate End Box, Trailing Cable, Radiant Drill Panel, Motor, Pumps, Tugger Haulage Etc At 4/5/6 And 7/8 Incline Of Dhori (K), Dhori Area For A Period Of Nine Months
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_295657_1 |
|
Reference Number |
GM(D)/SO(EnM)/DA/2023-24/103 |
| Tender Fee | |
| EMD | 28100 |
| Tender Value | |
| Place | Dhori Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | December 09, 2023 15:30 |
| End Date |
Expired
26/12/2023
Expired 892 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Plaster and white washing old isolation stopping of 08 nos. of panel-k of 7 and 8 incline, and 15 nos. panel o and m 4,5 and 6 incline of dhori (k) colliery
Plaster and white washing old isolation stopping of 08 nos. of panel-k of 7 and 8 incline, and 15 nos. panel o and m 4,5 and 6 incline of dhori (k) colliery
Read moreMaking of 325 nos. of subsidence pillars over proposed panel- o of 4,5 and 6 incline (200 nos) and panel-l of 7 and 8 incline (125 nos) and bush cutting 68300 sqm of dhori (k) colliery
Making of 325 nos. of subsidence pillars over proposed panel- o of 4,5 and 6 incline (200 nos) and panel-l of 7 and 8 incline (125 nos) and bush cutting 68300 sqm of dhori (k) colliery
Read moreRepairing of different switches (a) one (01) no drill panel (b) one (01) nos. acb, 300amp reroll burn make switch (c) one (01) no er of tugger haulage of 7/8 incline under dhori khas colliery.
Repairing of different switches (a) one (01) no drill panel (b) one (01) nos. acb, 300amp reroll burn make switch (c) one (01) no er of tugger haulage of 7/8 incline under dhori khas colliery.
Read moreMaking of 02 no rana haulage and 4 no tugger haulage foundation in 7 and 8 incline and 4,5 and 6 incline of dhori khas colliery of dhori area.
Making of 02 no rana haulage and 4 no tugger haulage foundation in 7 and 8 incline and 4,5 and 6 incline of dhori khas colliery of dhori area.
Read moreRepairing and maintenance works of one vole drum make tugger haulage assembly and its base frame of 7, 8 incline of dhori (k) colliery. ,dhori area ccl
Repairing and maintenance works of one vole drum make tugger haulage assembly and its base frame of 7, 8 incline of dhori (k) colliery. ,dhori area ccl
Read moreRepairing and full overhauling of 55hp, 550v mamc make endless haulage of 7/8 incline, dhori (k) colliery, dhori area
Repairing and full overhauling of 55hp, 550v mamc make endless haulage of 7/8 incline, dhori (k) colliery, dhori area
Read moreComplete repairing , full overhauling rectification work of 02 no. of rana make and 01 no.vishwa make tugger haulage assemblies at 7/8 incline of dhori(k) colliery
Complete repairing , full overhauling rectification work of 02 no. of rana make and 01 no.vishwa make tugger haulage assemblies at 7/8 incline of dhori(k) colliery
Read moreRepairing and rewinding of 550v induction motor of different capacity installed at 7/8 incline, dhori (k) colliery, dhori area, ccl.
Repairing and rewinding of 550v induction motor of different capacity installed at 7/8 incline, dhori (k) colliery, dhori area, ccl.
Read moreRepairing of eight (8) nos of switches (i) two nos of drill panel (ii) four nos of acb switches and two nos of starter gatein in r/o at 7/8 incline of dhori(k) colliery
Repairing of eight (8) nos of switches (i) two nos of drill panel (ii) four nos of acb switches and two nos of starter gatein in r/o at 7/8 incline of dhori(k) colliery
Read moreMaking of 08 nos. rana haulage foundation in 7 and 8 incline (04) and 4,5,and 6 incline (04) of dhori (k) colliery. (underground work)
Making of 08 nos. rana haulage foundation in 7 and 8 incline (04) and 4,5,and 6 incline (04) of dhori (k) colliery. (underground work)
Read moreof your Industry type