Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ce/ Nctpp Iii/Se/M/Comg/Ot 06/2025 26
|
| Description |
Boiler System Attending Steam Feed Water And Fuel Oil Leaks In Pipe Lines Valve Glands Bonnets And Flanges Of Feed Water System Super Heater System Re Heater System Fuel Oil System Sh Rh Spray System Soot Blower System Prds System And Sampling Syst
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_606291_1 |
|
Reference Number |
CE/ NCTPP III/SE/M/COMG/OT-06/2025-26 |
| Tender Fee | 0 |
| EMD | 15000 |
| Tender Value | - |
| Place | NCTPP III CHENNAI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=724695 |
| Start Date | September 19, 2025 22:00 |
| End Date |
Expired
03/10/2025
Expired 380 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ot-06
Removal of silt, slush, ash deposits and other waste materials in all the drains in a-zone area of mtps-ii
Read moreCe nctps iii se m i ot 23 26 27
Nctps iii mechanical i circle bm overhauling of hydraulic power supply unit of hwl valves and mefc valve rectification of defects in hwl control valve in boiler during annual overhaul period 2026 27
Read moreCe nctps iii se m i ot 18 26 27
Nctps iii mechanical i circle cad rodm plant overhauling of sac sba mb and its valves in dm plant during annual overhauling for the year 2026 27
Read moreCe nctps iii se m i ot 19 26 27
Nctps iii mechanical i circle common auxiliaries division rodm plant overhauling of various size pumps in swro skid c erd and rejection valve in swro skids during annual overhauling for the year 2026 27
Read moreCe nctps iii se m i ot 17 26 27
Nctps iii mechanical i circle common auxiliaries division rodm plant overhauling of dm feed pump bwro feed pump dmf back wash pump dm water transfer pump mixed bed regeneration pump and gear boxes in the peripheral driven half bridge type
Read moreCe nctps iii se m i ot 15 26 27
Nctps iii mechanical i circle common auxiliaries division rodm plant overhauling rectification of various capacity of dosing pumps and its agitators of uf swro bwro and dm plant to maintain the required level of filter fire and dm during aoh
Read moreCe nctps iii se m i ot 12 26 27
Nctps iii mechanical i circle mill plant maintenance division mill a to j overhauling of hot air gates hot air dampers cold air gates cold air dampers all linkage assembly and power cylinders of hot and cold air gates during annual overhaul
Read moreCe nctps iii se m i ot 16 26 27
Nctps iii mechanical i circle common auxiliaries division rodm plant dismantling and erection of msrl supports including cost of materials in the swro dosing tank agitator area and acid tank area during annual overhaul for the year 2026 27
Read moreCe nctps iii se m i ot 14 26 27
Nctps iii mechanical i circle mill plant maintenance division overhauling by dismantling cleaning rectification reconditioning and reassembling of feeder inlet raw coal chain operated manual gates bunker discharge gates actuators and sleeve
Read moreCe nctps iii se m i ot 13 26 27
Nctps iii mechanical i circle mill plant maintenance division mill a to j overhauling by dismantling cleaning inspection rectification reconditioning and reassembling of feeder outlet gates and its power cylinder and needle gates during aoh
Read moreof your Industry type