Tender Details
Particulars | Details |
---|---|
Title |
Patch Repair, Maintenance Pg Work Failed By Contractor And Rectification Of B.T. And C.C. Road Under P.W.D. Division Bhind
|
Description |
Patch Repair, Maintenance Pg Work Failed By Contractor And Rectification Of B.T. And C.C. Road Under P.W.D. Division Bhind
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11180 |
EMD | 1 Lakh |
Tender Value | |
Place | EXECUTIVE ENGINEER PWD DIVISION BHIND |
Link |
AAAAAAAAAA Login to view |
Start Date | June 11, 2025 23:00 |
End Date |
25/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreStructural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Structural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Read moreRepair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki
Repair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreInstalling small fountains in various areas and other important places under 22 zones of the city and carrying out maintenance work for three years.
Installing small fountains in various areas and other important places under 22 zones of the city and carrying out maintenance work for three years.
Read moreConstruction of c.c. and drain work behind santoshi mata temple near nrusinha ghat jhalriya math under zone no. 03
Construction of c.c. and drain work behind santoshi mata temple near nrusinha ghat jhalriya math under zone no. 03
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConstruction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77
Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreof your Industry type