Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Flood Protection Embankment From Rd 0 37000 D/S Dhilwan Along River Beas In District Kapurthala.
|
Description |
Restoration Of Flood Protection Embankment From Rd 0 37000 D/S Dhilwan Along River Beas In District Kapurthala.
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id | 2024_WR_132014_1 |
Reference Number |
E-Tender/PWRD/2024-25/06 |
Tender Fee | 6400 |
EMD | 4.5 Lakh |
Tender Value | |
Place | Kapurthala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267943 |
Start Date | December 27, 2024 21:30 |
End Date |
17/01/2025 ( Expired 118 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreAAAAAAAAAA
Login to viewCollection of toll tax from the vehicular traffic plying through the lochan das setu over river ajoy at nutanhat under burdwan north highway division in the district of purba bardhaman.
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreAAAAAAAAAA
Login to viewNirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreConstruction of flood protection wall/stone patching in river salki from the existing stone patching at gupteswar mandir upto 500m in the u/s and 100m in the d/s in village khaliapali under brahmanipali g.p. of boudh block(working rd 00m to 140m u/s
Flood protection embankment work
Read moreConstruction of approach road, additional approach road and protection work yamuna river bridge malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh (u.p.)
Read moreShifting of w/s pipe line from rengali camp chowk to tangarpali for improvement such as widening strengthening of rengali camp to tangarpali road from 0/000 km to 16/818 km in the district of bargarh.
Shifting of w/s pipe line from rengali camp chowk to tangarpali for improvement such as widening strengthening of rengali camp to tangarpali road from 0/000 km to 16/818 km in the district of bargarh.
Read moreNit_04 of eeudhd 2025_26
Permanent restoration of damagrd hard shoulder flank caused due to pipe laying by phe department along and across karandighi main town existing nh road from 0.541 km to 3.70 km under karandighi zone i piped water supply scheme in the district of ud
Read moreof your Industry type