1 Improvement Estimate For 3nos 7 5 Mtr Psc Poles Into 8 Mtr Psc Poles For Low Ground Clearance In Various Locations Under Thickanamcode Section In Thuckalay Division
|
| Description |
1 Improvement Estimate For 3nos 7 5 Mtr Psc Poles Into 8 Mtr Psc Poles For Low Ground Clearance In Various Locations Under Thickanamcode Section In Thuckalay Division
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_490529_1 |
|
Reference Number |
EE/D/TKY/ETW-22/Dt.03.10.2024 |
| Tender Fee | 0 |
| EMD | 1495 |
| Tender Value | - |
| Place | o/o EE/D/TKY |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582794 |
| Start Date | October 04, 2024 14:30 |
| End Date |
Expired
17/10/2024
Expired 728 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing of labour part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4c lt cables, pvc cables, removal of low-lying pvc lines along roads and crossings, ensuring statutory groun
Outsourcing of labour part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4c lt cables, pvc cables, removal of low-lying pvc lines along roads and crossings, ensuring statutory groun
Read moreOutsourcing of labour part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4c lt cables, pvc cables, removal of low-lying pvc lines along roads and crossings, ensuring statutory groun
Outsourcing of labour part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4c lt cables, pvc cables, removal of low-lying pvc lines along roads and crossings, ensuring statutory groun
Read moreImp estimate for ht lt line 1 no 9m psc pole into 40 feet rsj pole and 1no 8m psc pole into 9m psc pole in various location in low ground clearance under eraniel section various works in various section in eraniel c and i section thuckalay division
Imp estimate for ht lt line 1 no 9m psc pole into 40 feet rsj pole and 1no 8m psc pole into 9m psc pole in various location in low ground clearance under eraniel section various works in various section in eraniel c and i section thuckalay division
Read moreImprovement estimate for improving tail end voltage at krishnapuram dt by providing existing 7 2 11 conductor into 7 3 15 conductor and ing 2nos 8mtr psc poles under thuckalay section in thuckalay c and i section in thuckalay division
Improvement estimate for improving tail end voltage at krishnapuram dt by providing existing 7 2 11 conductor into 7 3 15 conductor and ing 2nos 8mtr psc poles under thuckalay section in thuckalay c and i section in thuckalay division
Read moreDcw estimate for 6nos 8mtr psc pole and lt line shifting as per the request of tmy mary joice at moovarpuram irumpili near vaniyakudi under thickanamcode section thuckalay c and i section in thuckalay division
Dcw estimate for 6nos 8mtr psc pole and lt line shifting as per the request of tmy mary joice at moovarpuram irumpili near vaniyakudi under thickanamcode section thuckalay c and i section in thuckalay division
Read moreTransportation of 3000 nos 8.00 mtr (wl-200kg)psc poles
Transportation of 3000 nos 8.00 mtr (wl-200kg)psc poles
Read moreTransportation of 3000 nos 8.00 mtr (wl-200kg)psc poles
Transportation of 3000 nos 8.00 mtr (wl-200kg)psc poles
Read moreSupply of a side back clamp for 8.0 mtr and 9.0 mtr psc poles
Supply of a side back clamp for 8.0 mtr and 9.0 mtr psc poles
Read moreTransporting of around 1000 nos of 8 mtr 200 kg psc poles from psc yard ayyampettai
As per tender specification
Read more1natural calamity estimate for replacement of 6nos 8mtr psc poles damaged due to heavy wind and rain in nandhavanam ss 250 kva under thuckalay section in various works under distribution thuckalay section in thuckalay division
1natural calamity estimate for replacement of 6nos 8mtr psc poles damaged due to heavy wind and rain in nandhavanam ss 250 kva under thuckalay section in various works under distribution thuckalay section in thuckalay division
Read moreof your Industry type