Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
105/125 Ss Covered Optical Fiber Bundle Of 1 Km Length
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2023/B/3514414 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 05, 2023 15:33 |
| End Date |
Expired
26/06/2023
Expired 1092 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | INFRARED OPTICS PRIVATE LIMITED | Make : NA Model : FL-SIMPLEX-105-125-SST-SCPC-SCPC-CABLE Title : 105/125 SS Covered Optical Fiber Bundle of 1 km Length | 24-06-2023 11:10:36 | MII | Qualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | INFRARED OPTICS PRIVATE LIMITED | Item Categories : 105/125 SS Covered Optical Fiber Bundle of 1 km Length | 2360000.00 | L1 |
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreHew 125 hiring of 1 no. driver for worthy administrator, hsvp faridabad and all other works contingent thereto.
Hew 125 hiring of 1 no. driver for worthy administrator, hsvp faridabad and all other works contingent thereto.
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhan
Construction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhanpur (wsa site), district-dhamtari, raipur territory.
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abha
Construction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abhanpur (wsa site), district-dhamtari, raipur territory
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of various road under pmgsy iv batch 1 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Construction of various road under pmgsy iv batch 1
 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Read moreConstruction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Construction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Read moreof your Industry type