Tender Details
Particulars | Details |
---|---|
Title |
General Preventing Garbage Disposal To Killi River Providing Fencing And Renovation Of Bathing Ghat At Left Bank Of Killi River Downstream Of Pangodu Bridge General Civil Work
|
Description |
General Preventing Garbage Disposal To Killi River Providing Fencing And Renovation Of Bathing Ghat At Left Bank Of Killi River Downstream Of Pangodu Bridge General Civil Work
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_604221_1 |
Reference Number |
IRR/IA/TR/878/2023_5_1_1/1 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | OFFICE OF EXECUTIVE ENGINEER THIRUVANANTHAPURAM |
Link | https://etenders.kerala.gov.in |
Start Date | September 18, 2023 22:30 |
End Date |
23/09/2023 ( Expired 602 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreRenovation of rnpd office bldg, raghunathpur ccc office building, store office godown, boundary wall and extension of aluminum cubicle at raghunathpur ccc office, surrounding area, drain renovation and tit-bit civil work under raghunathpur division.
Renovation of rnpd office bldg, raghunathpur ccc office building, store office godown, boundary wall and extension of aluminum cubicle at raghunathpur ccc office, surrounding area, drain renovation and tit-bit civil work under raghunathpur division.
Read moreDeposit-water supply scheme to poyya panchayath-nagara sanchaya padhathi- construction of intake well cum pump house and laying raw water pumping main -general civil work-1
Deposit-water supply scheme to poyya&#x0d panchayath-nagara sanchaya padhathi-&#x0d construction of intake well cum pump house&#x0d and laying raw water pumping main -general&#x0d civil work-1&#x0d
Read moreCleaning work in zone 02 (ward number 11 to 20) of nagar palika kotakasim and dumping the collected garbage at the designated place by own transport and annual contract for door-to-door garbage collection work
Cleaning work in zone 02 (ward number 11 to 20) of nagar palika kotakasim and dumping the collected garbage at the designated place by own transport and annual contract for door-to-door garbage collection work
Read moreAAAAAAAAAA
Login to viewProtection work along right bank of river nagar from start point to end point (length 1000.00 m) near sasan ghat at village pipla, g.p. lahutara i, block and p.s karandighi, dist. uttar dinajpur
Read moreReplacement of existing rcc np3 pipeline with 600mm id di k7 rising main including works of providing laying jointing testing and commissioning from jallalabad road stp disposal works up to baba deep singh gurudwara sahib at sri muktsar sahib
Replacement of existing rcc np3 pipeline with 600mm id di k7 rising main including works of providing laying jointing testing and commissioning from jallalabad road stp disposal works up to baba deep singh gurudwara sahib at sri muktsar sahib
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreReplacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Replacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Read moreof your Industry type