Tender Details

Particulars Details
Title
Repairing/Welding Work On The Cracked Portion Of The Turret Structure (Upper Carriage) And Swing Gear Box Foundation Lhs And Rhs And Repairing Of Compressor Assy Of Ekg5 A
Description
Repairing/Welding Work On The Cracked Portion Of The Turret Structure (Upper Carriage) And Swing Gear Box Foundation Lhs And Rhs And Repairing Of Compressor Assy Of Ekg5 A Shovel Sl No Hmb 560 Cil No Exc 2640 And Repairing Of Latch Bar With Its Housi
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_288221_1
Reference
Number
GM(D)/SO(X)/E-Tender/23-24/111
Tender Fee -
EMD 4500
Tender Value -
Place Excavation Department, G M Office, Dhori Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date September 07, 2023 15:30
End Date
Expired 18/09/2023

Expired 1123 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c

Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c

Read more
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Repairing/welding work on the cracked portion of the turret structure (upper carriage), swing gear box foundation (lhs and rhs), rep. of compressor assy. and rep. of m.g. foundation of ekg5a shovel si. no. hmb560 cil no. exc2640.

Repairing/welding work on the cracked portion of the turret structure (upper carriage), swing gear box foundation (lhs and rhs), rep. of compressor assy. and rep. of m.g. foundation of ekg5a shovel si. no. hmb560 cil no. exc2640.

Read more
Repairing /denting of cowling assy. turret structure and swing gear mounting base cracked portion of ck 300 shovel sl.no.exc-169 of sirka ocp.

Repairing /denting of cowling assy. turret structure and swing gear mounting base cracked portion of ck 300 shovel sl.no.exc-169 of sirka ocp.

Read more
Equiliser upper portion for brake foundation

For complete deion and other details, please refer to tender

Read more
Equiliser upper portion for brake foundation

For complete deion and other details, please refer to tender

Read more
Repairing of swing gear box (lhs and rhs) and swing motor (lhs and rhs) of zx650h model excavator machine, sl. no. exc-2961 of gvp ph ii ocp.

Repairing of swing gear box (lhs and rhs) and swing motor (lhs and rhs) of zx650h model excavator machine, sl. no. exc-2961 of gvp ph ii ocp.

Read more
Repairing of housing area and foundation assembly of both lhs and rhs swing pinion shaft of 10/ 70 shyam dragline of bina project.

Repairing of housing area and foundation assembly of both lhs and rhs swing pinion shaft of 10 / 70 shyam dragline of bina project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise