Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing/Welding Work On The Cracked Portion Of The Turret Structure (Upper Carriage) And Swing Gear Box Foundation Lhs And Rhs And Repairing Of Compressor Assy Of Ekg5 A
|
| Description |
Repairing/Welding Work On The Cracked Portion Of The Turret Structure (Upper Carriage) And Swing Gear Box Foundation Lhs And Rhs And Repairing Of Compressor Assy Of Ekg5 A Shovel Sl No Hmb 560 Cil No Exc 2640 And Repairing Of Latch Bar With Its Housi
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_288221_1 |
|
Reference Number |
GM(D)/SO(X)/E-Tender/23-24/111 |
| Tender Fee | - |
| EMD | 4500 |
| Tender Value | - |
| Place | Excavation Department, G M Office, Dhori Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 07, 2023 15:30 |
| End Date |
Expired
18/09/2023
Expired 1123 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRepairing/welding work on the cracked portion of the turret structure (upper carriage), swing gear box foundation (lhs and rhs), rep. of compressor assy. and rep. of m.g. foundation of ekg5a shovel si. no. hmb560 cil no. exc2640.
Repairing/welding work on the cracked portion of the turret structure (upper carriage), swing gear box foundation (lhs and rhs), rep. of compressor assy. and rep. of m.g. foundation of ekg5a shovel si. no. hmb560 cil no. exc2640.
Read moreRepairing /denting of cowling assy. turret structure and swing gear mounting base cracked portion of ck 300 shovel sl.no.exc-169 of sirka ocp.
Repairing /denting of cowling assy. turret structure and swing gear mounting base cracked portion of ck 300 shovel sl.no.exc-169 of sirka ocp.
Read moreEquiliser upper portion for brake foundation
For complete deion and other details, please refer to tender
Read moreEquiliser upper portion for brake foundation
For complete deion and other details, please refer to tender
Read moreRepairing of swing gear box (lhs and rhs) and swing motor (lhs and rhs) of zx650h model excavator machine, sl. no. exc-2961 of gvp ph ii ocp.
Repairing of swing gear box (lhs and rhs) and swing motor (lhs and rhs) of zx650h model excavator machine, sl. no. exc-2961 of gvp ph ii ocp.
Read moreRepairing of housing area and foundation assembly of both lhs and rhs swing pinion shaft of 10/ 70 shyam dragline of bina project.
Repairing of housing area and foundation assembly of both lhs and rhs swing pinion shaft of 10 / 70 shyam dragline of bina project.
Read moreof your Industry type