Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ultrasonic Testing Of Rails And Sej Over Hubballi Division For A Period Of 24 Months.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73537483 |
|
Reference Number |
SWR-UBL-USFD-RAIL-012024 |
| Tender Fee | 0 |
| EMD | 2.32 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73537483/viewNitPdf_4478516.pdf |
| Start Date | February 14, 2024 23:43 |
| End Date |
Expired
07/03/2024
Expired 953 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ultrasonic testing of rails using phased array ultrasonic single rail tester (paut srt) in jp division.
Ultrasonic testing of rails using phased array ultrasonic single rail tester (paut srt) in jp division.
Read moreUltrasonic testing of rails including through testing of rails and welds with contractor s own b-scan machines equipped with 9 channels srt/drt and two extra 37 degree probes and operators on nominated routes over south eastern railway including hand probing (flange testing) of welds as per indian railway standard specification for ultrasonic testing of rails/welds, revised-2020 (document no. t-53) and manual for ultrasonic testing of rails and welds, revised 2022 (with latest amendment)
Ultrasonic testing of rails including through testing of rails and welds with contractor s own b-scan machines equipped with 9 channels srt/drt and two extra 37 degree probes and operators on nominated routes over south eastern railway including hand probing (flange testing) of welds as per indian railway standard specification for ultrasonic testing of rails/welds, revised-2020 (document no. t-53) and manual for ultrasonic testing of rails and welds, revised 2022 (with latest amendment)
Read moreCarrying out ultrasonic testing of flash butt (fb) welds using phased array ultrasonic testing (paut) on 52 kg cc+8+2t routes and 60 kg, 880 grade rails on 25t routes over eastern railway. issued by rdso/lko with latest guideline
Carrying out ultrasonic testing of flash butt (fb) welds using phased array ultrasonic testing (paut) on 52 kg cc+8+2t routes and 60 kg, 880 grade rails on 25t routes over eastern railway. issued by rdso/lko with latest guideline
Read moreUltrasonic testing of rails and at welds with digital ultrasonic flaw detectors(usfd) through outsourcing and reporting the same as per indian railway standard specification for ultrasonic testing of rails and welds (revised-2020) read with latest correction slips and manual for ultrasonic testing of rail and welds (revised-2022) read with latest correction slips on various identified routes/sections in khurda road, sambalpur and rayagada division of east coast railway.
Ultrasonic testing of rails and at welds with digital ultrasonic flaw detectors(usfd) through outsourcing and reporting the same as per indian railway standard specification for ultrasonic testing of rails and welds (revised-2020) read with latest correction slips and manual for ultrasonic testing of rail and welds (revised-2022) read with latest correction slips on various identified routes/sections in khurda road, sambalpur and rayagada division of east coast railway.
Read moreHubballi division: proposed construction of station approach road along with storm water drain and improvements to land scaping in lower circulating area at hubballi railway station.(maintenance period:12 months)
Hubballi division: proposed construction of station approach road along with storm water drain and improvements to land scaping in lower circulating area at hubballi railway station.(maintenance period:12 months)
Read moreHubballi division: provision of quick watering system between road 1 & 2 and road 3 & 4 at vijayapura (bjp) station (maintenance period- 12 months).
Hubballi division: provision of quick watering system between road 1 & 2 and road 3 & 4 at vijayapura (bjp) station (maintenance period- 12 months).
Read moreHubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Hubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Read moreof your Industry type