Tender Details

Particulars Details
Title
Providing, Making And Laying Steel Flooring Blocks In The Balance Areas Of Forge Shop, Midhani
Description
Providing, Making And Laying Steel Flooring Blocks In The Balance Areas Of Forge Shop, Midhani
Organisation MIDHANI | Public Sector Undertakings
Tender Id 2025_MDN_96486_1
Reference
Number
AP20241036/EADVT/552/24-25
Tender Fee 0
EMD 1.27 Lakh
Tender Value
Place MIDHANI, HYDERABAD
Link eprocuremidhanigsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=105984
Start Date January 10, 2025 23:30
End Date

13/02/2025 ( Expired 118 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.

Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.

Read more
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1

Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1

Read more
Feasibility study and preparation of detailed project report for place making and beautification at broken bridge area in adyar

Feasibility study and preparation of detailed project report for place making and beautification at broken bridge area in adyar, area below the mrts line near indira nagar railway station and velachery rail over bridge.

Read more
Notice inviting tender (nit) for design, engineering, manufacture, supply, erection, testing and commissioning of bath breaking and bath finishing machine in rodding shop-i for smelter plant (nalco), angul

Notice inviting tender (nit) for design, engineering, manufacture, supply, erection, testing and commissioning of bath breaking and bath finishing machine in rodding shop-i for smelter plant (nalco), angul

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
A/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )

A/r and m.o to residential builiding under division no-3 at nabha estate shimla&amp#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise