Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of 8 M Long 410 Sp 11 Swaged Type Galvanized Steel Tubular Poles
|
| Description |
Supply Of 8 M Long 410 Sp 11 Swaged Type Galvanized Steel Tubular Poles Including Base Plate, U Clamp, Bolts, Nuts, Steppers Fr P Coating To Various Sub Regional Stores Under Ksebl
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2025_KSEB_818733_1 |
|
Reference Number |
KSEB/CESCM/2025-26 /00031/XC/TUBULAR POLE Dated 03-11-2025 |
| Tender Fee | 44250 |
| EMD | 2.94 Lakh |
| Tender Value | - |
| Place | All over Kerala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1372315 |
| Start Date | November 07, 2025 20:30 |
| End Date |
Expired
24/11/2025
Expired 281 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of vehicle tata 207 and 9 ton truck (for transportation of materials incl steel poles upto 13 mtr long) on need basis including driver, fuel, maintenance, insurance, taxes and all other incidental charges as per terms and conditions.
Hiring of vehicle tata 207 and 9 ton truck (for transportation of materials incl steel poles upto 13 mtr long) on need basis including driver, fuel, maintenance, insurance, taxes and all other incidental charges as per terms and conditions.
Read moreDismantling and taking out of damaged lt steel,replacement of lt steel tubular swaged poles 410 sp
Read more
Supply of 8 m long 540 sp-11 swaged type galvanized steel tubular poles including base plate, u clamp, bolts, nuts, steppers e r p coating to various sub regional stores under kseb
Supply of 8 m long 540 sp-11 swaged type galvanized steel tubular poles including base plate, u clamp, bolts, nuts, steppers e r p coating to various sub regional stores under kseb
Read moreFor supply of 11 mtr. long steel tubular pole with welded base plate, 410-sp-55 bottom portion hot dip galvanized
For supply of 11 mtr. long steel tubular pole with welded base plate, 410-sp-55 bottom portion hot dip galvanized
Read moreFor supply of 11 mtr. long steel tubular pole with welded base plate, 410-sp-55 bottom portion hot dip galvanized
For supply of 11 mtr. long steel tubular pole with welded base plate, 410-sp-55 bottom portion hot dip galvanized
Read moreSupply of 11 meter steel tubular poles (sp-55)
Supply of 11 meter steel tubular poles (sp-55)
Read more9 meter long hot dipped galvanised swaged steel tubular poles in two pieces with flange joint
Read more
For supply of 13 mtr. long steel tubular pole with welded base plate, 410-sp-70 bottom portion hot dip galvanized
For supply of 13 mtr. long steel tubular pole with welded base plate, 410-sp-70 bottom portion hot dip galvanized
Read moreFor supply of 13 mtr. long steel tubular pole with welded base plate, 410-sp-70 bottom portion hot dip galvanized
For supply of 13 mtr. long steel tubular pole with welded base plate, 410-sp-70 bottom portion hot dip galvanized
Read moreof your Industry type