Tender Details

Particulars Details
Title
Supplying, Installation, Testing And Commissioning Of Intelligent Water Level Monitoring Instruments (Wlmi) For Two Years For Identified Important/Major Bridges Under Dy.Ce/Br Line/Mlg
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77572289
Reference
Number
DCBL232024MLG
Tender Fee 0
EMD 2.45 Lakh
Tender Value
Place Guwahati
Link https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77572289/viewNitPdf_4724611.pdf
Start Date September 28, 2024 18:48
End Date

21/10/2024 ( Expired 233 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511

Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)

Read more
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat

Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat

Read more
Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award

Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award

Read more
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block

Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block

Read more
Supply, installation, testing, commissioning and certification of 60 no. of dmis (driver machine interface) compatible with onboard atc system on line-1 and 2.

Supply, installation, testing, commissioning and certification of 60 no. of dmis (driver machine interface) compatible with onboard atc system on line-1 and 2.

Read more
Comprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.

Comprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.

Read more
Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Read more
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp

Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&amp#x0d

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Supply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes

Supply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise