Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Air, Noise, Water And Stack Monitoring As Per Pcb & Calibration Of Pressure Gauges, Pv Valve, Oti/W
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5256109 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 12, 2024 20:32 |
| End Date |
Expired
02/09/2024
Expired 771 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NITYA LABORATORIES
1006634.4
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ENVIRONMENT & SAFETY SOLUTION | Make : Environmental Services Model : Air, Noise, Water and Stack monitoring as per PCB Title : Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/WTI | 26-08-2024 17:07:31 | MII | Disqualified |
| 2 | ENVIRONMENT POLLUTION ANALYSIS LAB | Make : na Model : Air, Noise, Water And Stack Monitoring As Per PCB Title : Air, Noise, Water And Stack Monitoring As Per PCB & Calibration Of Pressure Gauges, PV Valve, OTI/WT | 02-09-2024 13:55:01 | MII | Qualified |
| 3 | NEW POWER TRACKS | Make : Environmental Services Model : Air, Noise, Water and Stack monitoring as per PCB Title : Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/WTI | 28-08-2024 20:16:02 | MII | Disqualified |
| 4 | NITYA LABORATORIES | Make : NITYA LABORATORIES Model : Nitya Lab Title : Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/WTI | 02-09-2024 12:36:08 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ENVIRONMENT POLLUTION ANALYSIS LAB (MII) | Item Categories : Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/W | 1370404.80 | Disqualified |
| 2 | NITYA LABORATORIES(MII) | Item Categories : Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/W | 1006634.40 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Air, Noise, Water and Stack monitoring as per PCB & calibration of Pressure Gauges, PV valve, OTI/WTI | NITYA LABORATORIES | Nitya Lab | 1 | ₹ 1006634.400 |
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreCalibration services - safety relief valve as per as per sor sl no1 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - pressure safety valve as per sor sl no 2 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - pressure safety valve, leser, (set pressure 40 kg per cm2) as per sor sl no 3 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - creep relief valve as per sor sl no 4 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - creep relief valve (set pressure 23 kg per cm2) as per sor sl no 5 schedule of rates under section vii of atc as per approved atc document as per approved atc document as
Calibration services - safety relief valve as per as per sor sl no1 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - pressure safety valve as per sor sl no 2 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - pressure safety valve, leser, (set pressure 40 kg per cm2) as per sor sl no 3 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - creep relief valve as per sor sl no 4 schedule of rates under section vii of atc as per approved atc document as per approved atc document as per approved atc document,calibration services - creep relief valve (set pressure 23 kg per cm2) as per sor sl no 5 schedule of rates under section vii of atc as per approved atc document as per approved atc document as
Read moreCustom bid for services - lumpsum amount incl all charges and gst for part a for deployment of contract labour for monitoring of environment parameters for 02 years on pre disclosed rates as per scc and sow,custom bid for services - lumpsum amount incl all charges and gst for part b for ambient air monitoring where one lumpsum equals to 432 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for stack monitoring where one lumpsum equals to 432 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for noise monitoring in work zone where one lumpsum equals to 552 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for co voc benzene and h2s in work zone where one lumpsum equals to 552 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for co2 monitoring
Custom bid for services - lumpsum amount incl all charges and gst for part a for deployment of contract labour for monitoring of environment parameters for 02 years on pre disclosed rates as per scc and sow,custom bid for services - lumpsum amount incl all charges and gst for part b for ambient air monitoring where one lumpsum equals to 432 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for stack monitoring where one lumpsum equals to 432 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for noise monitoring in work zone where one lumpsum equals to 552 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for co voc benzene and h2s in work zone where one lumpsum equals to 552 ea as per scc and sow of tender document,custom bid for services - lumpsum amount incl all charges and gst for part b for co2 monitoring
Read moreCalibration and repair of moisture meter,test cup,spur gear,bevel gear,guide nut,insulation disk,thrust bearing,bevel pinion,micro controller,electronic switch,com. pcb,com. meggar box,temperature sensor,i.c. regulator 7805,timer i.c. 7555,i.c 4051,i.c 7447,eprom,f.n.d. board,ic 7135,complete body universal,bracket,spur pinion bigsmall,40 pin header set,pinion brush,lead screw,volume cup a,volume cup b,volume cup c,allen key,battery compartment,adaptor,connector leads 12 pin,connector leads 2 3 pins,relay,segment i.c.,i.c. 7600,switching transistor bc 107,crystal 6.144 mhz,ic base 16 pins,ic base 28 pins,ic 7600,dry cell 1.5 nv,at mega 328 p set,lcd 16x2,duvcon mager complete sticker,22 ohm,printer i.c.,module cell for date and time,ic base 20 pin,complete power supply,scale screw,carrier handle,body universal without spare,rachet handle,max 232,pressure plate,ic 74373,spur gear axle,wooden box big small,body dmm,plunger agro,crank handle agro,top plunger,bottom plunger,circular scale,bk handle test cup,pcb l
Calibration and repair of moisture meter,test cup,spur gear,bevel gear,guide nut,insulation disk,thrust bearing,bevel pinion,micro controller,electronic switch,com. pcb,com. meggar box,temperature sensor,i.c. regulator 7805,timer i.c. 7555,i.c 4051,i.c 7447,eprom,f.n.d. board,ic 7135,complete body universal,bracket,spur pinion bigsmall,40 pin header set,pinion brush,lead screw,volume cup a,volume cup b,volume cup c,allen key,battery compartment,adaptor,connector leads 12 pin,connector leads 2 3 pins,relay,segment i.c.,i.c. 7600,switching transistor bc 107,crystal 6.144 mhz,ic base 16 pins,ic base 28 pins,ic 7600,dry cell 1.5 nv,at mega 328 p set,lcd 16x2,duvcon mager complete sticker,22 ohm,printer i.c.,module cell for date and time,ic base 20 pin,complete power supply,scale screw,carrier handle,body universal without spare,rachet handle,max 232,pressure plate,ic 74373,spur gear axle,wooden box big small,body dmm,plunger agro,crank handle agro,top plunger,bottom plunger,circular scale,bk handle test cup,pcb l
Read moreControl valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Control valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Read moreTesting of 6 inch pv valves,calibration of pressure gauges,calibration of safety valve,calibration
Read more
Ambient air monitoring,ambient noise monitoring,stack emission monitoringfireeng,pcb nor,dg inserti
Read more
Dg noise monitoring,stack emission analysis,workzone noise monitoring,workzone air monitoring,waste
Read more
of your Industry type