Tender Details

About Tender

🏭 Ntpc Talcher Requires Ash Removal Services 🚫 Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids For The Removal Of Ash From The Overflow Line (Ofl) Of Stage Ii Ash Dyke At Its Talcher Facility. 🏗️ 📅 Bid Submission Deadline: April 15, 2024, 3:00 Pm Tender Fee: Inr 1328 Emd: Inr 100,000 The Project Involves Mechanical Ash Removal And Is Part Of The Ongoing Maintenance And Operational Activities At The Talcher Plant. Interested Bidders Must Submit Detailed Proposals, Including Methodology, Equipment Specifications, Safety Protocols, And Cost Estimates, By The Stipulated Deadline. Keywords: Ntpc Limited, Ash Removal, Mechanical Services, Public Sector Undertaking, Talcher, Infrastructure Maintenance, Tender, Bid Submission
Particulars Details
Title
Removal Of Ash From Ofl Of Stage Ii Ash Dyke By Mechanical Means At Ntpc Talcher.
Description
Removal Of Ash From Ofl Of Stage Ii Ash Dyke By Mechanical Means At Ntpc Talcher.
Organisation NTPC Limited | Public Sector Undertakings
Tender Id 2024_NTPC_84959_1
Reference
Number
NTPC/USSC-CPG1/9900275817
Tender Fee 1328
EMD 1 Lakh
Tender Value -
Place Western Region Head Quarter-II
Link
View Original Tender Notice

http://www.ntpctender.com/nit/listJobs.asp?nitId=26958

Start Date March 28, 2024 15:30
End Date
Expired 15/04/2024

Expired 909 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Spares for silo vent fan in dry ash handling plant ktps- v stage

Spares for silo vent fan in dry ash handling plant ktps- v stage

Read more
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage

Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage

Read more
Procurement of stage 4 silo unloading spout-ntpc unchahar

Procurement of stage 4 silo unloading spout-ntpc unchahar

Read more
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage

Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage

Read more
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system

Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system

Read more
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system

Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system

Read more
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage

Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage

Read more
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Read more
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage

Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage

Read more
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise