Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Ntpc Talcher Requires Ash Removal Services 🚫 Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids For The Removal Of Ash From The Overflow Line (Ofl) Of Stage Ii Ash Dyke At Its Talcher Facility. 🏗️ 📅 Bid Submission Deadline: April 15, 2024, 3:00 Pm Tender Fee: Inr 1328 Emd: Inr 100,000 The Project Involves Mechanical Ash Removal And Is Part Of The Ongoing Maintenance And Operational Activities At The Talcher Plant. Interested Bidders Must Submit Detailed Proposals, Including Methodology, Equipment Specifications, Safety Protocols, And Cost Estimates, By The Stipulated Deadline. Keywords: Ntpc Limited, Ash Removal, Mechanical Services, Public Sector Undertaking, Talcher, Infrastructure Maintenance, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Removal Of Ash From Ofl Of Stage Ii Ash Dyke By Mechanical Means At Ntpc Talcher.
|
| Description |
Removal Of Ash From Ofl Of Stage Ii Ash Dyke By Mechanical Means At Ntpc Talcher.
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_84959_1 |
|
Reference Number |
NTPC/USSC-CPG1/9900275817 |
| Tender Fee | 1328 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Western Region Head Quarter-II |
| Link |
View Original Tender Notice
http://www.ntpctender.com/nit/listJobs.asp?nitId=26958 |
| Start Date | March 28, 2024 15:30 |
| End Date |
Expired
15/04/2024
Expired 909 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreProcurement of stage 4 silo unloading spout-ntpc unchahar
Procurement of stage 4 silo unloading spout-ntpc unchahar
Read moreSpares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreof your Industry type