Tender Details

Particulars Details
Title
Overhauling Kit For Flow Meter Valve (Ii76202) Of Electric Ccb System Ccb System To Kbi Kit No.Xki/Kit/01589, Consisting Of 10 Items As Per Attached Annexure.
Description
Overhauling Kit For Flow Meter Valve (Ii76202) Of Electric Ccb System Ccb System To Kbi Kit No.Xki/Kit/01589, Consisting Of 10 Items As Per Attached Annexure.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date September 24, 2026 19:18
End Date
Open 28/10/2026

13 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Overhauling kit for control portion er (787776-1994) of electric ccb system of m/s kbi. one set consisting of 68 items as per kbi annexure attached.

Overhauling kit for control portion er (787776-1994) of electric ccb system of m/s kbi. one set consisting of 68 items as per kbi annexure attached.

Read more
Overhauling kit for pvlt breather port of 20 cp for ccb system kbi kit no.xki/kit/03569 or latest. kit consists of 7 items as per attached annexure.

Overhauling kit for pvlt breather port of 20 cp for ccb system kbi kit no.xki/kit/03569 or latest. kit consists of 7 items as per attached annexure.

Read more
Overhauling kit for pressure reducing valve (i71472/0800a/1136508/0800) of electric ccb 2.0 brake system, kbi kit no. xki/kit/02482. set consisting of 09 items. as per attached annexure.

Overhauling kit for pressure reducing valve (i71472/0800a/1136508/0800) of electric ccb 2.0 brake system, kbi kit no. xki/kit/02482. set consisting of 09 items. as per attached annexure.

Read more
Overhauling kit for unloaded valve (kbi part no. ii97710) of electric ccb system for three phase locomotives. set consists of 04 items as per attached annexure.

Overhauling kit for unloaded valve (kbi part no. ii97710) of electric ccb system for three phase locomotives. set consists of 04 items as per attached annexure.

Read more
Overhauling kit for drain valve of electric ccb to kbi part no. i82281 for 3-phase locomotives as per attached annexure-a. (one set consists of 23 items 33 nos.)

Overhauling kit for drain valve of electric ccb to kbi part no. i82281 for 3-phase locomotives as per attached annexure-a. (one set consists of 23 items 33 nos.)

Read more
Overhauling kit for magnet valve (part no. i94900/1110) of electric ccb system of m/s kbil. one set consisting of 26 items as per kbil annexure attached.

Overhauling kit for magnet valve (part no. i94900/1110) of electric ccb system of m/s kbil. one set consisting of 26 items as per kbil annexure attached.

Read more
Set of pressure governor and kit of pressure governor of m/s knorr bremse make electric ccb for 3-phase locomotive, consisting of 05 items as per annexure attached.

Set of pressure governor and kit of pressure governor of m/s knorr bremse make electric ccb for 3-phase locomotive, consisting of 05 items as per annexure attached.

Read more
Kit for pressure governor low mr (i84649/06555) /rgcp1 (i84649/10080) / rgcp2 (i84649/10080) of electric ccb system. one set consisting of 03 items. item detail as per annexure attached.

Kit for pressure governor low mr (i84649/06555) /rgcp1 (i84649/10080) / rgcp2 (i84649/10080) of electric ccb system. one set consisting of 03 items. item detail as per annexure attached.

Read more
Portable pressure dew point meter with standard accessories for measuring in ccb panel of electric locomotives as per the specification attached as annexure -a, make - hnl or endee or michel or fluke.

Portable pressure dew point meter with standard accessories for measuring in ccb panel of electric locomotives as per the specification attached as annexure -a, make - hnl or endee or michel or fluke.

Read more
Digital gloss meter as per specification attached in annexure a.

Digital gloss meter as per specification attached in annexure a.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise