Tender Details

Particulars Details
Title
Up Gradation Of Existing Railway Tracks From 52 Kg To 60 Kg Track Structure At Nad Curve Line
Description
Up Gradation Of Existing Railway Tracks From 52 Kg To 60 Kg Track Structure At Nad Curve Line, Npb Main, Loop Lines And Jp Main Lines From Ch. 0.00 To 2000 M At Western Sector.
Organisation Visakhapatnam Port Trust | Public Sector Undertakings
Tender Id 2024_VPT_219845_1
Reference
Number
IENG/CP/EE (Rlys)/T/71 Dt. 16.12.2024
Tender Fee 1770
EMD 3.04 Lakh
Tender Value
Place VPA
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=244319
Start Date December 17, 2024 20:30
End Date

17/01/2025 ( Expired 118 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Read more
Construction of cc road, strengthening of existing sewer chambers, foot-path, storm water line, culvert, electric line shifting etc. at dhar road, chandan nagar square to airport road, via nagin nagar and nandan nagar.

Construction of cc road, strengthening of existing sewer chambers, foot-path, storm water line, culvert, electric line shifting etc. at dhar road, chandan nagar square to airport road, via nagin nagar and nandan nagar.

Read more
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Read more
Upgradation of analog cctv system to ip based cctv system at line -2 from jahangirpuri to millennium city center.

Upgradation of analog cctv system to ip based cctv system at line -2 from jahangirpuri to millennium city center.

Read more
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise