Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Dish Ends, Shells And Nozzles Of Purge Incineration Boiler F4602 (K 632), Purge Plant, Petro Uc
|
Description |
Replacement Of Dish Ends, Shells And Nozzles Of Purge Incineration Boiler F4602 (K 632), Purge Plant, Petro Uc
|
Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
Tender Id | 2024_FACT_820445_1 |
Reference Number |
5061/2024-2025/E29907 |
Tender Fee | 0 |
EMD | 12000 |
Tender Value | |
Place | Udyogamandal |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=862240 |
Start Date | August 08, 2024 19:30 |
End Date |
23/08/2024 ( Expired 284 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying of 600 mm id di k-7 rising main from mps to lissara drain and replacement of machinery of mps at raman mandi district bathinda
Providing and laying of 600 mm id di k-7 rising main from mps to lissara drain and replacement of machinery of mps at raman mandi district bathinda
Read moreCa no. ge/k-46/2025-26 - special repair work of external electrification of lt poles and allied items at certain units at kargil and provn of ro plant at post 43 at 22 kumaon under ge kargil
Ca no. ge/k-46/2025-26 - special repair work of external electrification of lt poles and allied items at certain units at kargil and provn of ro plant at post 43 at 22 kumaon under ge kargil
Read moreRepair/replacement of roof treatment, cleaning of plant vegetation, water supply, sanitary fittings, joinery work, cleaning of overhead tanks etc. at dgnp (v) office complex and certain other places under dgnp(v)
Repair/replacement of roof treatment, cleaning of plant vegetation, water supply, sanitary fittings, joinery work, cleaning of overhead tanks etc. at dgnp (v) office complex and certain other places under dgnp(v)
Read moreSupply and installation of insulation for 41 ata steam piping from so2 acid plant to petro plant steam header in fact uc.
Supply and installation of insulation for 41 ata steam piping from so2 acid plant to petro plant steam header in fact uc, as per tender conditions.
Read moreComprehensive maintenance of ro plant, water treatment plant, swimming pool alongwith repairs/servicing of connected installations at navy area (kolkata) and repair/replacement of ci/di/gi pipe line, valves and repair/servicing of pump motors , dosin
Comprehensive maintenance of ro plant, water treatment plant, swimming pool alongwith repairs/servicing of connected installations at navy area (kolkata) and repair/replacement of ci/di/gi pipe line, valves and repair/servicing of pump motors , dosin
Read moreCutting and removing of grass and overgrowth at petro plant areas in fact uc
Cutting and removing of grass and overgrowth at petro plant areas in fact uc
Read moreRepair maint of external water supply system incl repair/replacement of unserviceable pipelines valves valves pit chamber various motor pump set cleaning of sumps ro plant and other connected work at shakurbasti and hirankudna under ge north
Repair maint of external water supply system incl repair/replacement of unserviceable pipelines valves valves pit chamber various motor pump set cleaning of sumps ro plant and other connected work at shakurbasti and hirankudna under ge north
Read moreReplacement of floor tiles and reconstruction of damaged drain and allied civil works in dm plant area at hwpk plant site
Replacement of floor tiles and reconstruction of damaged drain and allied civil works in dm plant area at hwpk plant site
Read moreReplacement of dra and drb scrubber structural tower of suphala plant at rcf trombay factory, chembur, mumbai-400074
Replacement of dra and drb scrubber structural tower of suphala plant at rcf trombay factory, chembur, mumbai-400074
Read morePre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Pre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Read moreof your Industry type